My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-09_PERMIT FILE - C1981035A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035A
>
2012-01-09_PERMIT FILE - C1981035A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:18 PM
Creation date
1/13/2012 10:09:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
1/9/2012
Doc Name
Land use
Section_Exhibit Name
KII Appendix 02 Licenses and Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTII <br />Page No. IS <br />Permit No. COG-850000 <br />A. NOTIFICATION REQUIREMENTS (continued) <br />• In addition to the demonstration required above, a pemtittee who wishes to establish the affirmative defense of upset for a violati~ <br />of effluent limitations based upon water quality standazds shall also demonstrate through monitoring, modeling or other methods that <br />the relevant standards were achieved in the receiving water. <br />c. Burden of Proof <br />In any enforcement proceeding, the permittee seeking to establish the occurrence of an upset has the burden of proof. <br />8. Discharee Point <br />Any discharge to [he waters of the State from a point source other than specifically authorized by this petrnit is prohibited. <br />9. Proper Operation and Maintenance <br />The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related <br />appurtenances) which are installed or used by dre pertnittee as necessary to achieve compliance with the conditions ofthis permit. Proper <br />operation and maintenance includes effective performance and adequate laboratory and process controls, including appropriate quality <br />assurance procedures. This provision requires the operation ofback-up or auxiliary facilities or similaz systems, which are installed by <br />the pemtittee only when necessary to achieve compliance with the conditions of the permit. <br />10. Minimization of Adverse Impact <br />The pemuttee shall take all reasonable steps to minimize or prevent any discharge of sludge use or disposal in violation of this permit, <br />which has a reasonable likelihood of adversely affecting human health or the enviromnent. As necessary, accelerated or additional <br />monitoring to determine the nature and impact of the noncomplying discharge is required. <br />11. Removed Substances <br />• Solids, sludges, or other pollutants removed in the course of treatment or control of wastewaters shall be disposed in accordance wits. <br />applicable state and federal regulations. . <br />For all domesric.wastewater treatment works, at industrial facilities, the permittee shall dispose of sludge in accordance withall State and <br />Federal regulations. ~~ ~ ~ - <br />12. Submission of Incorrect or Incomplete Information <br />Where the permittee failed to submit any relevant facts in a permit application, or submitted incorrect information in apennit application <br />or report to the Division, the pemrittee shall promptly submit the relevant information, which was not submitted, or any additional <br />information needed to correct any erroneous information previously subrztitted <br />13. Bwass <br />a. Bypasses are prohibited and [he Division may take enforcement action against the per.-nittee for bypass, unless: <br />i. The bypass is unavoidable to prevcnt loss of life, personal injury, or severe property damage; <br />ii. There were no feasible alternatives to bypass such as the use of auxiliary treatment facilities, retention of untreated wastes, or <br />maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment <br />should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal <br />periods of equipment downtime or preventive maintenance; and <br />iii. Proper notices were submitted in compliance with Part II.A.4. <br />b. "Severe property damage" as used in &.is Subsection means substantial physical dam: ;,e to the treatment facilities, which causes <br />• them to become inoperable, or subsL~ntia] and permanent loss of natural resources, w§ricii can reasonablybe expected [o occur inth~ <br />absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. <br />c. The petmittee may allow a bypass to occur which does not cause effluent limitations to 1:e exceeded, but only if it also is for essential <br />maintenance or to assure optimal operation. These bypasses are not subject to the provisions ofparagraph a. above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.