that the railcar loadout plan liability (original operation and the on-the- <br />ground condition) is $964,090. Consequently, there are reclamation bonds <br />in place for either operational plan. <br />Because of the inactively at the facility and uncertainty with regards to <br />the future use (i.e., railcar loadout, railcar load-in or both), HGTI re- <br />affirmed with CDMG that the Hayden Gulch Loadout permit was in temporary <br />cessation in correspondence dated August 30, 2005. <br />Since CDMGs approval of the original permit application (Permit C-92-081) <br />in May 1993, HGTI has submitted several technical revisions (TR), minor <br />revisions (MR) and permit renewals (RN). A brief summary of the revisions <br />follows. <br />TR-O1 - Responses to Stipulations 2 and 3 attached to Permit C-92-081. <br /> The TR was submitted July 22, 1993 and the proposed decision to <br /> approve was issued on April 27, 1994. <br />MR-O1 - Change of Operator and Update Tab 3, Adjudication File. The MR <br /> was submitted July 25, 1994 and the proposed decision to <br /> approve was issued on August 22, 1994. <br />MR-02 - Removal of RRC-15 from Permit. The MR was submitted February <br /> 27, 1995 and the proposed decision to approve was issued on <br /> March 6, 1995. <br />MR-03 - Updated of Ownership and Control Update. The MR was submitted <br /> November 7, 1995 and the proposed decision to approve was <br /> issued on December 11, 1995. <br />TR-02 - Responses to 1995 Midterm Issues. The TR was submitted January <br /> 31, 1996 and the proposed decision to approved was issued on <br /> December 19, 1996. <br />MR-04 - Submittal of Midterm Bond Increase. The MR was submitted on <br /> March 21, 1996 and the decision to approved was issued on April <br /> 5, 1996. <br />MR-05 - Update of Operator, Ownership and Control Information. The MR <br /> was submitted on July 31, 1996 and the decision to approved was <br /> issued on September 10, 1996. <br />MR-06 - Revise Legal Description. The MR was submitted on August 12, <br /> 1996 and the decision to approve was issued on August 30, 1996. <br />MR-07 - Add Culvert RRC-15 to Permit. The MR was submitted on May 23, <br /> 1997 and the decision to approve was issued on May 23, 1997. <br /> <br />MR-16 6 Revised 11/07 <br />