Laserfiche WebLink
TAB 1 <br />HAYDEN GULCH LOADOUT PERMIT SUMMARY <br />STATUSUPDATE <br />In March 2011, Permit Revision (PR -01) was submitted to include the Tie - Across Haul Road <br />(TAHR) as an integral part of the Hayden Gulch Loadout Permit C -92 -081. Originally the <br />TAHR was included as part of the Seneca II -W permit and was used as a haul road to <br />transport coal to the Hayden Power Station. Now that the Seneca II -W mine is no longer an <br />active mining operation, the TAHR has been transferred to the Hayden Gulch Loadout Permit <br />area. The Hayden Gulch Loadout is now designated as a coal handling facility in Active <br />status as of July 5, 2011 due to reclamation activities. <br />The appropriate information once contained in the Seneca II -W permit has now been included <br />in Permit C -92 -081. This updated/additional information has been included in this permit <br />revision (PR -01) in the following areas: <br />• Tab 1, Permit Summary <br />• Tab 3, Adjudication File <br />• Tab 5, Cultural Resources <br />• Tab 9, Soil Resources <br />• Tab 10, Vegetation <br />• Tab 12, Facilities <br />• Tab 17, Reclamation Schedule <br />• Tab 20, Revegetation Plan <br />• Tab 23, Bonding <br />PR -01 Revised 10 /11 <br />