Laserfiche WebLink
McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: November 11, 2011 <br />Weather Conditions: Overcast, 40 to 50 degrees F. <br />Location of Points/Wells <br />SW -1 East Salt Creek above McClane under haul road bridge <br />SW -2 McClane Creek at culvert below mine <br />SW -3 Munger Creek at haul road culvert below mine <br />SW-4 East Salt Creek –2 miles downstream of SW -8 <br />SW -5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW -7 Munger Creek above Mine <br />SW-8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW -X McClane Creek at confluence with East Salt Creek <br />Fourth Quarter 2011 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />GW -1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW -3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW -6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW -9 Alluvium of East Salt Creek south of McClane Office - TD 53.5 <br />GW -10 Alluvium of East Salt Creek south of proposed waste rock disposal area - TD 44.4 <br />Feet <br />GW -1 Total Depth 14.3 <br />GW -3 Total Depth 47.3 ..��q�rr <br />GW -6 Total Depth 18.8 Depth revised when pipe was damaged �0 �RE�� <br />during gob pile construction. e o a�; '' Tit :�► <br />GW -9 Total Depth 53.5 4 • q �� � G• • - <br />GW -10 Total Depth 50.0 o I* � * ® <br />~ 19230 <br />mo w! <br />�A * <br />14r » t <br />Surface Water <br />Sample <br />Point <br />Time <br />Flow <br />(cfs) pH <br />EC <br />umhos /cm Temp (C) <br />SW -1 <br />10:00 AM <br />0.40 <br />7.6 <br />2600 1.1 <br />SW -2 <br />10:00 AM <br />Dry <br />- <br />- - <br />SW -3 <br />11:10 AM <br />Dry <br />- <br />- - <br />SW -5 <br />10:05 AM <br />Dry <br />- <br />- - <br />SW-6 <br />11:25 AM <br />Dry <br />- <br />- - <br />SW -7 <br />11:25 AM <br />Dry <br />- <br />- - <br />SW-8 <br />12:20 AM <br />0.4 <br />8.0 <br />3000 1.6 <br />Ground Water <br />Sample <br />Point <br />Time <br />SWL <br />(feet) <br />pH <br />p <br />EC Temp C <br />umhos /cm p ( ) <br />GW -1 <br />9:40 AM <br />10.4 <br />7.1 <br />6400 11.1 <br />GW -3 <br />11:19 AM <br />39.6 <br />7.4 <br />4600 10.3 <br />GW -6 <br />11:25 AM <br />Dry-18.8' <br />GW -9 <br />10:10 AM <br />25.7 <br />7.3 <br />6500 11.2 <br />GW -10 <br />10:30 AM <br />48.0 <br />7.2 <br />10500 10.5 <br />McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: November 11, 2011 <br />Weather Conditions: Overcast, 40 to 50 degrees F. <br />Location of Points/Wells <br />SW -1 East Salt Creek above McClane under haul road bridge <br />SW -2 McClane Creek at culvert below mine <br />SW -3 Munger Creek at haul road culvert below mine <br />SW-4 East Salt Creek –2 miles downstream of SW -8 <br />SW -5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW -7 Munger Creek above Mine <br />SW-8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW -X McClane Creek at confluence with East Salt Creek <br />Fourth Quarter 2011 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />GW -1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW -3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW -6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW -9 Alluvium of East Salt Creek south of McClane Office - TD 53.5 <br />GW -10 Alluvium of East Salt Creek south of proposed waste rock disposal area - TD 44.4 <br />Feet <br />GW -1 Total Depth 14.3 <br />GW -3 Total Depth 47.3 ..��q�rr <br />GW -6 Total Depth 18.8 Depth revised when pipe was damaged �0 �RE�� <br />during gob pile construction. e o a�; '' Tit :�► <br />GW -9 Total Depth 53.5 4 • q �� � G• • - <br />GW -10 Total Depth 50.0 o I* � * ® <br />~ 19230 <br />mo w! <br />�A * <br />14r » t <br />