My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-09_INSPECTION - M1980047
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1980047
>
2012-01-09_INSPECTION - M1980047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:18 PM
Creation date
1/11/2012 2:18:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980047
IBM Index Class Name
INSPECTION
Doc Date
1/9/2012
Doc Name
Inspection Report
From
DRMS
To
Exxon Mobile Corporation
Inspection Date
12/16/2011
Email Name
THM
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No problems or possible violations were observed during the inspection. <br />PERMIT #: M -1980 -047 <br />INSPECTOR'S INITIALS: THM <br />INSPECTION DATE: December 16, 2011 <br />OBSERVATIONS <br />This inspection was conducted as part of the normal monitoring program established by the Colorado Division <br />of Reclamation, Mining and Safety (DRMS). <br />This was a partial inspection with the primary focus to observe the tracer test being conducted during the <br />inspection. No other components of the mine were inspected on December 16, 2011. <br />The tracer test was conducted from inside of the mine by gravity feeding tracer water into the wells that are <br />located inside of the mine. The tracer observed was contained in a 1,650 gallon tank that gravity fed water into <br />the well located in the decline of the mine. The purpose of the tracer test was to characterize the rate at which <br />water in the B- groove aquifer travels. The operator had continuous water monitoring equipment installed in <br />down - gradient monitoring wells. The tracer was also observed in the mine drain (see photograph on following <br />page). <br />Also observed in the mine were the proposed borehole locations for the grout containment feature that is <br />proposed to be installed below EF -1. The commencement of installing the grout feature is January 2012. <br />Responses to this inspection report should be directed to Travis Marshall at the Division of Reclamation, <br />Mining and Safety, Grand Junction Field Office, 101 South 3 Street, Room 301, Grand Junction, Colorado <br />81501, phone no. (970) 241 -2042. <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.