My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-15_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2011-12-15_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:46:07 PM
Creation date
1/11/2012 7:31:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
12/15/2011
Doc Name
Inspection Report
From
DRMS
To
Twentymile Coal Company
Inspection Date
12/13/2011
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 13, 2011 C -1982- 056 /Foidel Creek Mine JDM <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions were taken as a result of this inspection. Receipt of the civil penalty <br />associated with the NOV listed below is ongoing. <br />Infraction Number: CV2011005 <br />Inspection Date: August 18, 2011 <br />Date Issued: September 18, 2011 <br />Primary Topic: Gen. Compliance With Mine Plan <br />Secondary Topic: <br />Tertiary Topic: <br />Description: Failure to place all underground development waste in existing disposal areas <br />approved by the Division within the permit area. Failure to dispose of noncoal wastes in a State approved <br />disposal site operated in accordance with local, State and Federal requirements. Failure to conduct all <br />surface coal mining and reclamation operations only as described in the approved application. Failure to <br />comply with the terms and conditions of the pen all applicable perfonnance standards of the Act, and <br />the requirements of the Rules. <br />Abatement #: 1 <br />Abatement Due Date: 9/22/2011 <br />Abatement Description: Step 1: Submit a plan to ensure that a) the underground development <br />waste subject to this NOV is segregated from noncoal waste and disposed of in the approved Refuse <br />Disposal Area and b) the noncoal waste subject to this NOV is disposed of in a State approved disposal <br />site operating in accordance with local, State and Federal Requirements. <br />Abatement #: 2 <br />Abatement Due Date: 9/29/2011 <br />Abatement Description: Step 2: Obtain final approval of the submitted plan <br />Abatement #: 3 <br />Abatement Due Date: 10/7/2011 <br />Abatement Description: Step 3: Implement the approved plan to ensure all underground <br />development waste and noncoal waste is disposed in the approved locations. <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.