My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-06_REVISION - M1977410
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2012-01-06_REVISION - M1977410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:25:36 PM
Creation date
1/10/2012 12:17:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
REVISION
Doc Date
1/6/2012
Doc Name
Response to Adequacy Review
From
RPM, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:'youlder County Clerk & Record€ <br />i, 750 33rd Street, #201 <br />oulder, CO 80301-254S <br />Proof of Placing the Corrected Permit Application Information with County Clerk and <br />Recorder's Office: <br />SIGNED BY: <br />DATE: <br />BOULDER COUNTY CLERK AND RECORDER <br />RECEIPT FOR THE CORRECTED PERMIT APPLICATION INFORMATION FOR <br />THE CALAIS RESOURCES COLORADO CROSS MINE PERMIT AMENDMENT, TO <br />PERMIT NO. M 1977 -410 PLACED WITH BOULDER COUNTY CLERK AND <br />RECORDER. <br />COUNTY CLERK <br />Information placed with the Boulder County Clerk and Recorder includes responses to the <br />following DRMS adequacy questions: <br />6.3.2 Exhibit B — Site Description: <br />1. The US Army Corp of Engineers (COE) has determined the areas around the Pond No.1 <br />are jurisdictional Wetlands. (a) Please clarify what implications this has on reclaiming the pond <br />areas. (b)Will approval from the COE be required? (c) Will additional mitigation measures be <br />required? <br />6.3.3 Exhibit C — Mining Plan: <br />2. The Applicant has stated a complete surface and groundwater monitoring program will <br />be submitted as part of a future permit revision. (a) Please specify when the Applicant <br />anticipates submitting the revision addressing surface and groundwater monitoring. (b) Also, <br />indicate how many quarters of water quality data have been collected to date. <br />3. The Applicant has stated two septic tanks /fields will be installed at the site. Please <br />clarify if there are any surface features associated with the septic systems which will need to be <br />reclaimed. <br />4. The Applicant has stated the waste rockfrom the development of the new Cross Mine <br />Decline Portal will be made available to Boulder County. The approved Mining Plan states <br />waste rockfrom future development will be utilized as stope-fill in the Mine. Please clarify if <br />waste rockfrom development will still be utilized as stope -fill in the Mine. <br />5. The Applicant has stated no waste rock disposed underground until all appropriate <br />agency approvals are obtained. (a) Please specify the agency approvals which will be obtained <br />in order to dispose of waste rock in the mine workings. (b) Also, please clarify if the disposal of <br />waste rock underground has occurred at the Cross Gold Mine. <br />7. The amendment area includes the Caribou Mine Office and a dry room. Please state how <br />the existing office and dry room will be utilized in the future. <br />RECEIVF <br />JAN 6 6 ?_G <br />Division of Reclamati <br />Mining & Safety <br />
The URL can be used to link to this page
Your browser does not support the video tag.