Laserfiche WebLink
Task description: <br />Site: Fountain Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />004 <br />12/30/2011 <br />BMK <br />Agency or organization name: DRMS <br />Ownership Cost /Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Total unit Cost /Hour: $275.39 <br />Total Fleet Cost/Hour: $275.39 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />24,200 <br />1.270 <br />30,734 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: 250 feet <br />Repalce overburden /pit bottom <br />Unadjusted hourly production: 546.0 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />0% <br />5,342 feet <br />$80.19 <br />$148.12 <br />$8.59 <br />$38.49 <br />Material weight: 2,700 lbs/LCY <br />State: Colorado <br />County: El Paso <br />Cat Handbook <br />Weight description: Earth - Wet excavated <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />BULLDOZER WORK <br />Permit Action: Amendment <br />0.750 <br />1.000 <br />1.100 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Division of Reclamation, Mining & Safety <br />Source <br />(AVG.) <br />(CAT HB) <br />(50% SL) <br />Abbreviation: None <br />Page 1 of 2 <br />Permit /Job #: M1982155 <br />Filename: M155 -004 <br />CIRCES Cost Estimating Software <br />