Laserfiche WebLink
Task description: <br />Site: Fountain Pit <br />PROJECT IDENTIFICATION <br />Task #: 003 <br />Date: 12/30/2011 <br />User: BMK <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi - Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Agency or organization name: DRMS <br />Ownership Cost /Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost /Hour: $275.39 <br />Total Fleet Cost/Hour: $275.39 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />1,951 <br />1.215 <br />2,370 LCY <br />Weight description: Top Soil <br />Replace topsoil <br />State: Colorado <br />County: El Paso <br />$80.19 <br />$148.12 <br />$8.59 <br />$38.49 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 250 feet <br />Unadjusted hourly production: 546.0 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: -5 % <br />Average site altitude: 5,342 feet <br />Material weight: 1,600 lbs /LCY <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 1.000 <br />Dozing method: 1.200 <br />BULLDOZER WORK <br />Page 1 of 2 <br />Permit Action: Amendment Permit /Job #: M1982155 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />(S -BY -S) <br />Abbreviation: None <br />Filename: M155 -003 <br />CIRCES Cost Estimating Software <br />