Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />cut and fill back wall <br />DOZER <br />M <br />128.00 <br />$35,401.00 <br />$6,603.00 <br />$1,664.00 <br />$33,214.00 <br />$6,932.00 <br />$10,888.00 <br />$6,138.00 <br />replace overburden <br />DOZER <br />24.00 <br />replace 4" of topsoil <br />DOZER <br />6.00 <br />replace overburden on pit floor <br />DOZER <br />120.00 <br />replace topsoil 4 inches over 15 acres <br />DOZER <br />25.00 <br />seed and mulch <br />REVEGE <br />42.00 <br />mob /demob <br />MOBILIZE <br />14.00 <br />SUBTOTALS: <br />359 <br />$ $100,840.00 <br />Task description: <br />Site: Fountain Pit <br />PROJECT IDENTIFICATION <br />Task #: 006 <br />Date: 12/30/2011 <br />User: BMK <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />Permit Action: Amendmnet <br />State: Colorado <br />County: El Paso <br />Financial warranty processing (legal /related costs): <br />Engineering work and /or contract/bid preparation: <br />Reclamation management and /or administration: <br />COST SUMMARY <br />DRMS <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />2.02 Total = <br />0.00 Total = <br />0.00 Total = <br />10.00 Total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />500.00 <br />0.00 <br />5.00 <br />CONTINGENCY: 3.00 <br />Permit /Job #: M1982155 <br />Abbreviation: None <br />Filename: M155 -006 <br />Total = <br />Total = <br />$2,036.97 <br />$0.00 <br />$0.00 <br />$10,084.00 <br />$12,120.97 <br />$112,960.97 <br />500.00 <br />$0.00 <br />$5,648.05 <br />Total = $3,025.20 <br />TOTAL INDIRECT COST = $21,294.22 <br />TOTAL BOND AMOUNT (direct + indirect) = $122,134.22 <br />