Laserfiche WebLink
Section - 2.05.3 <br />second fan will be controlled via internal doors. Only one fan will run at a time and the first fan will <br />remain fully operable as a spare. The second fan will not increase flow volume, rather it will increase <br />flow pressures thus reducing the occurrence of "stalls ". <br />See Exhibit 2.05- E1 -BCA1 Existing Conditions, Exhibit 2.05- E1 -BCA2 Facility Layout — Drainage <br />and Sediment Control and Exhibit 2.05 -M6 Sheet 7 of 7 — Facility Post Mine Topography for facility <br />layout and sediment control considerations. See Exhibit 2.05 —E5 Reclamation Details for soil <br />recovery and reclamation material mass balance considerations. Exhibit 2.05- E1 -BCA4 Facilities As- <br />Built contains the latest facility layout. <br />MR -97 <br />2.05 -12c Rev. December 2011 <br />