Laserfiche WebLink
Section 18: Portions of SE' /a <br />Section 19: Portions of NI/2 <br />All west of the 6th Principal Meridian, totaling 4,093.0 acres, of which 1,534.5 acres were <br />approved to be disturbed by surface operations (1,334.5 acres in mine area, 200 acres in Tie <br />Across Haul Road area). Ownership of the surface by private, Federal and State interests is <br />3,967.1, 70.2 and 55.7 acres, respectively. Mineral ownership is 3,056 acres Federal and 434 <br />acres private. Permit area acreage will be reduced with PR -6. The new total acreage will be <br />3,878.5, of which 3,808.3 surface acres are privately owned and 70.2 are federal. There will not <br />be any state owned acreage within the permit boundary with approval of this revision. Mineral <br />ownership of the area will be 3,216.2 acres federal and 662.3 acres private, with no state owned <br />mineral ownership remaining. <br />Seneca II -W Findings Document 2 C- 1982 -057 <br />Permit Revision No. 6 January 6, 2012 <br />