My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-04_REVISION - M2001002 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001002
>
2012-01-04_REVISION - M2001002 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:25 AM
Creation date
1/9/2012 7:02:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001002
IBM Index Class Name
REVISION
Doc Date
1/4/2012
Doc Name
Cost Summary
From
DRMS
To
File
Type & Sequence
SI1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Weimer One Gravel <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />004 <br />1/4/2012 <br />GRM <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Cat D8T - 8SU <br />310 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Total unit Cost/Hour: $199.86 <br />Total Fleet Cost/Hour: $199.86 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />9,167 <br />1.250 <br />11,459 LCY <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Reduce north highwall cut -fill <br />-25 % <br />5,860 feet <br />State: <br />County: <br />$58.56 <br />$102.81 <br />$0.00 <br />$38.49 <br />2,650 lbs /LCY <br />BULLDOZER WORK <br />Permit Action: 2012 update <br />DRMS <br />Source of estimated swell factor: Cat Handbook <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Unadjusted hourly production: 1,400.0 LCY /hr <br />Colorado <br />Montrose <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 0.900 <br />Dozing method: 1.000 <br />Source <br />(AVG.) <br />(CAT HB)) <br />(GEN.) <br />Page 1 of 2 <br />Permit/Job #: M2001002 <br />Abbreviation: None <br />Filename: M002 -004 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.