Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Haul topsoil for slope placement <br />Site: Weimer One Gravel Permit Action: 2012 update <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />006 <br />1/4/2012 <br />GRM <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />Agency or organization name: DRMS <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost/hour: $262.51 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />1,408 <br />1,584 <br />HOURLY PRODUCTION <br />Scraper Work Team <br />2,550 lbs /LCY <br />Earth - Dry packed <br />81,600 pounds <br />32.00 LCY <br />State: Colorado <br />County: Montrose <br />- Scraper: <br />- Dozer: <br />Equipment Description <br />Cat 631G <br />NA <br />NA <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />Source of estimated swell factor: Cat Handbook <br />COSTShift basis: 1 per day <br />Sunnort Eauinment <br />Swell factor: 1.125 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />24.00 <br />34.00 <br />29.00 <br />29.00 <br />Permit/Job #: M2001002 <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: M002 -006 <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$75.63 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$161.94 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$262.51 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$262.51 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />SCRAPER TEAM WORK <br />Task description: Haul topsoil for slope placement <br />Site: Weimer One Gravel Permit Action: 2012 update <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />006 <br />1/4/2012 <br />GRM <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />Agency or organization name: DRMS <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost/hour: $262.51 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />1,408 <br />1,584 <br />HOURLY PRODUCTION <br />Scraper Work Team <br />2,550 lbs /LCY <br />Earth - Dry packed <br />81,600 pounds <br />32.00 LCY <br />State: Colorado <br />County: Montrose <br />- Scraper: <br />- Dozer: <br />Equipment Description <br />Cat 631G <br />NA <br />NA <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />Source of estimated swell factor: Cat Handbook <br />COSTShift basis: 1 per day <br />Sunnort Eauinment <br />Swell factor: 1.125 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />24.00 <br />34.00 <br />29.00 <br />29.00 <br />Permit/Job #: M2001002 <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: M002 -006 <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />