Laserfiche WebLink
be to maximum depth. The reclamation plan for the area now being excavated is a water <br />storage reservoir. No permanent reclamation will be done until such time as there is sufficient <br />mine wall exposed and sloped to allow the installation of the reservoir lining. Given the <br />considerable reduction in market demand, beginning liner installation is not anticipated until <br />2013 at the earliest. <br />