Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />002 <br />003 <br />004 <br />005 <br />006 <br />Close mine portal <br />MINESEAL <br />- - � - - <br />0.00 <br />$312.28 <br />$1,754.00 <br />$99.00 <br />$1,137.40 <br />$2,057.88 <br />Slope reduction for waste rock stockpile <br />EXCAVATE <br />5.29 <br />Topsoil replacement, 4 inch depth <br />EXCAVATE <br />0.29 <br />Revegetation <br />REVEGE <br />0.00 <br />Haul reclamation equipment to and from job site. <br />MOBILIZE <br />7.90 <br />SUBTOTALS: <br />13.48 <br />$ $5,360.56 <br />Task description: Cost summary and task totals <br />Oyama Tunnel Exploration Permit Action: <br />Site: Project 2011 NOI Review <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 12/22/2011 County: San Juan <br />User: WHE <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />• <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $108.28 <br />Performance bond: 1.05 Total = $56.29 <br />Job superintendent: 6.74 Total = $399.68 <br />Profit: 10.00 Total = $536.06 <br />TOTALO &P= $1,100.31 <br />CONTRACT AMOUNT (direct + O & P) = $6,460.87 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />COST SUMMARY <br />0.00 <br />0.00 <br />5.00 <br />Permit/Job#: P2011032 <br />Abbreviation: None <br />Filename: P032 -001 <br />Total = <br />Total = <br />0.00 <br />$0.00 <br />$323.04 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $1,423.35 <br />TOTAL BOND AMOUNT (direct + indirect) = $6,783.91 <br />