My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-28_HYDROLOGY - M1977300
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977300
>
2011-12-28_HYDROLOGY - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:46:30 PM
Creation date
1/4/2012 7:53:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
HYDROLOGY
Doc Date
12/28/2011
Doc Name
Notice of Violation, Amendment 3
From
Cotter
To
CDPHE-WQCD
Permit Index Doc Type
Hydrology Report
Email Name
AJW
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Whetstone' <br />Associates <br />To: Randy Whicker. (Cotter Corporation. N.S.L.) <br />From: Nathan Page. (Whetstone Associates) <br />Date: April26.2011 <br />Subject: Material Volume Calculations for Potential Removal Action <br />1. INTRODUCTION <br />2. METHODS <br />34 <br />Technical Memorandum <br />Cotter Corporation. N.S.L.. (Cotter) personnel collected soil samples from 35 locations at the <br />Schwartzwalder Mine for laboratory analysis of radium -226 and uranium in October 2010. The <br />work was conducted under Technical Revision 14 (TR 14) to the mine plan. The purpose of the <br />study was to detemiine zones of elevated radium -226 in the fill material that may require mitigation. <br />Using data provided by Cotter. Whetstone Associates performed 3D mapping of these zones and <br />calculated the material volumes. The purpose of this tech memo is to describe the methods and <br />assumptions used by Whetstone personnel in the 3D mapping and volume calculations for radium - <br />226. <br />2.1 Overview of Sampling Methods <br />A stratified soil sample set was collected at each sample location by Cotter personnel. Sample <br />depths ranged from the surface to the total depth of excavation (18 feet maximum). generally at 1 <br />foot intervals. Eighteen sample sets were collected from the water treatment trench excavation (TR <br />series) to total depths ranging from 5 to 6 feet below ground surface (bgs) and 17 sample sets were <br />collected from various pit locations (DP series) to total depths ranging from 3 to 18 feet bgs. A total <br />of 183 soil samples were analyzed for radium -226. <br />In addition to sample collection. the water treatment pipeline trench excavation was traversed with a <br />hand -held gamma scanner providing a qualitative analysis of radium -226 levels in the subsurface. <br />The depth profile at each trench soil sample location was scanned. and a depth profile was scanned <br />at nine additional soil observation locations (TR -OBS series). <br />2.2 Generation of Sample Location Coordinates <br />The x -y coordinates of 35 soil sample points and 9 soil observation points were estimated from a <br />map generated by field personnel. Surface elevations were estimated using spot elevations from the <br />2010 elevation survey performed by Great Divide Consulting and contour lines from a 1990 mine <br />facilities map. Although GPS coordinates were collected for each soil sample and observation point. <br />the GPS accuracy level was unacceptable due to the steep canyon walls. Coordinates for each <br />sample location are shown in Table 1 and sample locations are plotted in Figure 1. <br />Whetstone Associates, Inc. <br />104 W Ruby Ave. • Gunnison, Colorado 81230 • Phone 970 -641 -7471 • Fax 970 -641 -7431 <br />4109C <br />
The URL can be used to link to this page
Your browser does not support the video tag.