My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-21_REPORT - M1977252
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977252
>
2011-12-21_REPORT - M1977252
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:52:29 PM
Creation date
1/4/2012 7:52:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977252
IBM Index Class Name
REPORT
Doc Date
12/21/2011
From
General Shale Brick
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total acres <br />backfilled: <br />Total acres <br />seeded w/ <br />approved mix: <br />Total acres <br />w /topsoil <br />replaced: <br />Topsoil <br />replacement <br />depth (in.): <br />Total acres <br />mulched w/ <br />approved mulch: <br />Mulch application <br />rate (tons): <br />Total acres <br />graded: <br />Total acres <br />fertilized w/ <br />apvd fertilizer: <br />Seed <br />application <br />method: <br />Fertilizer <br />application <br />method: <br />Mulch <br />application <br />method: <br />Permit # - (11- /977- 7- 752 <br />Annual Report <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall <br />submit the annual fee, an annual report and map showing the extent of current disturbances to affected land, <br />required monitoring information, reclamation accomplished to date and during the preceding year, any new <br />disturbance that is anticipated to occur during the upcoming year, any reclamation that will be performed during <br />the upcoming year, the dates for the beginning of active operations, and the date active operations ceased for the <br />year, if any. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules <br />and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1) YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2) YES (NO") <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more or less than 180 days per year? <br />If "LESS ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />t <br />MORE LESS <br />YES NO <br />YES 0: <br />
The URL can be used to link to this page
Your browser does not support the video tag.