My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-02_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-01-02_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
1/4/2012 7:00:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
1/2/2012
Doc Name
As Built Certification Report for the last portion of Phase V Pad Ore Storage area 3rd Portion
From
DRMS
To
CC&V
Type & Sequence
AM9
Email Name
BMK
TC1
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />January 2, 2012 <br />Mr. Timm Comer <br />Manager Environmental Resources <br />Cripple Creek & Victor Gold Mining CO <br />P.O.Box 191 <br />Victor, Colorado 80860 <br />Re: As Built Certification Report for the last portion of Phase V Leach Pad Ore Storage area 3rd <br />Portion, Amendment #9, Permit # M- 1980 -244, Cresson Project. <br />Dear Mr. Comer: <br />The Division of Reclamation Mining and Safety (the Division) has completed the review of the As Built <br />Certification Report, for the last portion of the Phase V, leach pad. The report included three volumes. <br />Volume I thru Volume III. The volumes included the Construction Quality Assurance/ Quality Control, <br />CQA monitoring of the Earthworks, CQA /CQC Monitoring of Geosynthetic Installation, daily construction <br />summary reports, weekly construction reports, record survey Documentation, Certificate Boundary and <br />As Built Drawings. The pad was constructed in accordance with the approved specification by the <br />Division. <br />The entire Financial Warranty for the area covered under Amendment # 9 is posted and approved by the <br />Division. CC &V can commence application of solution at this time. <br />If you have questions please contact me or Tim Cazier at the Division. <br />Sincerely, <br />Berhan Keffelew <br />Environ metal Protection Specialist <br />CC: Tim Cazier <br />Tom Kaldenbach <br />Office of <br />Mined Land Reclamation <br />STATE OF COLORADO <br />C <br />D I V I S I O N OF <br />RECLAMATI ON <br />MINING <br />& — <br />SAFETY <br />John W H1ckeniooper <br />. Governor <br />Mike King <br />Executive Director <br />Loretta Pineda <br />Director <br />Office of <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.