My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-31_PERMIT FILE - M1996052
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1996052
>
2007-08-31_PERMIT FILE - M1996052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:52 PM
Creation date
12/29/2011 11:07:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996052
IBM Index Class Name
PERMIT FILE
Doc Date
8/31/2007
Doc Name
Light Industrial Stormwtr permit/Sand & Gravel Mining Permit/Ready Mixed Aggregates
From
Brierley Associates LLC
To
CDPHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Stormwater vs. Process Water <br />Do you discharge any of the following process generated wastewaters from your facility, to state waters? <br />XX No ❑ Yes Product wash waters <br />XX No l Yes Maintenance /equipment wash waters <br />XX No❑ Yes Transport waters (e.g., slurries) <br />XX No❑ Yes Scrubber waters (crushers or clarifiers) <br />❑ No XX Yes Mine dewatering (groundwater and/or runoff from the mine) <br />If you answered YES to any of these questions, continue on to Item 9. <br />If you answered NO to all of these questions, skip to Item 18. <br />9. Location map: A location map designating the facility property, discharge points and receiving waters shall be submitted. The <br />map shall be from a 71/4 or 15 minute USGS quad sheet, or a map of comparable scale. A north arrow shall be shown. The map <br />must be on paper 8' /2 x 11 inches. <br />See Site Sketch for proposed discharge points. <br />10. Site Sketch: A legible general sketch of the site shall be submitted, showing appurtenant facilities (buildings, ponds, diversion <br />ditches, stockpiles, etc.), stream location, numbered discharge points, sampling and flow monitoring points. The map must be on <br />paper 8 1/2 x 11 inches. The outfalls shall be labeled to correspond with the numbers listed in 15. <br />Site is presently unmined Temporary stockpile locations to be determined during future mining. Sampling and flow monitoring <br />points to consist of each of the two discharge points as they are sequentially used during mining. <br />11. Site - specific conditions: <br />a) Does this facility have bulk storage of diesel fuel, gasoline, solvents, fertilizer, <br />or other hazardous materials on site? XX No ❑ Yes <br />b) Is this operation located within one mile of a Landfill, or any mine or mill tailings? <br />c) Does the dewatering area have or possibly have groundwater contamination, such as <br />Plumes from leaking underground storage tanks, etc.? <br />3 <br />XX No ❑ Yes <br />XX No ❑ Yes <br />Note: Environmental Site Assessment for property transaction during 1998 indicated no such possibility. <br />If YES for any of these, please show location of the landfill, tailings or possible groundwater contamination on the location map in <br />item 8 or in the general sketch in item 10. Please explain the location, extent of contamination, and possible effect on the discharges <br />from this facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.