Laserfiche WebLink
(i) Description of how mining will affect the quantity and quality of surface and <br />ground water and methods that will be used to minimize such disturbances: <br />No mining shall occur. No ground water was intercepted. All storm water runoff is into <br />the pit area and drains onto the adjacent Harry Corkle Construction Pit. It is then dealt <br />with according to that Pits approved permits. <br />(j) Description as to how the Operation will comply with applicable Colorado water <br />laws and regulations governing injury to existing water rights: <br />No water rights will be affected since mining is complete and no storm water is retained <br />on site. <br />(k) Description as to how the Operation will handle acid or toxic producing <br />materials: <br />No acid or toxic materials will be used or encountered on this site. <br />(1) Description as to what measures will be taken to minimize disturbance to the <br />hydrologic balance, prevent off -site damage, and provide for a stable configuration <br />of the reclaimed area consistent with the proposed future land use: <br />The hydrologic balance will not be influenced by reclamation on this site. All drainage is <br />internal to the pit area. (Please see (i) above.) The site will be regraded, topsoil replaced, <br />seeded and mulched to stabilize the area. <br />A Stormwater Management Plan should not be needed since the site will be in active <br />reclamation and only for a very short period of time. In addition, Stormwater <br />Management will be according to the existing plan for the adjacent Harry Corkle <br />Construction Pit. However, best management practices will be followed at the site during <br />reclamation. (Please see (i) above.) <br />(m) Description of onsite material processing, facilities and chemicals used: <br />No on -site mineral processing will occur. <br />(n) Identification of the primary and secondary commodities mined and intended <br />uses: <br />No mining will occur. <br />(o) Identification of the expected incidental products mined and intended uses: <br />No mining will occur. <br />(p) Describe if explosives will be used, if so demonstrate if off site areas will be <br />adversely affected: <br />No use of explosives will be used during reclamation. <br />16 <br />