My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-22_GENERAL DOCUMENTS - M1990057
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1990057
>
2011-12-22_GENERAL DOCUMENTS - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:46:25 PM
Creation date
12/28/2011 7:23:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
12/22/2011
Doc Name
Notice to Accept and Comply with the Requirements of Subsections (2) and (3) of Rule 7.2.3 DMO Desig
From
The Union Milling Company
To
DRMS
Permit Index Doc Type
General Correspondence
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 21, 2011 <br />t'Mr. Michael Cunningham <br />Environmental Protection Specialist <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Nick Michael <br />Manager <br />Union Milling Company, LLC <br /><T � j j <br />The Union Milling Company <br />P.0 Box 620490 <br />Littleton, CO 80162 -0490 <br />+1.303 947 3499 <br />I'I r ^ 201 <br />✓ '� v <br />Re: Permit M1990 -057, Leadville Mill, Notice to Accept and Comply with the Requirements of <br />Subsections (2) and (3) of Rule 7.2.3, DMO Designation , <br />Dear Mr. Cunningham, <br />Union Milling Company (UMC) is responding to the Division's correspondence notifying UMC that <br />effective 23 November 2011 the Leadville Mill is a Designated Mining Operation (DMO). <br />UMC herby accepts the Division's DMO determination and has, in fact, already initiated compliance <br />activities to address the requirements as set forth in Rule 7.2.3. This is with the understanding that UMC, <br />holding an active permit, will proceed with the collection and submission of the Environmental Protection <br />Plan (EPP), aka Exhibit U, concurrent with re- commissioning and operating of the mill. <br />UMC requests, per Rule 7.2.3.2.c, 364 days to prepare and submit the EPP. <br />Please contact me directly for additional information or clarification to this letter. I may be reached at <br />303 - 947 -3499, nmichael @unionmilling.com, or PO Box 620490 Littleton, CO 80162 -0490. <br />4 E L 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.