My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-21_INSPECTION - M1978222UG
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1978222
>
2011-11-21_INSPECTION - M1978222UG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:13 PM
Creation date
12/27/2011 10:17:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978222UG
IBM Index Class Name
INSPECTION
Doc Date
11/21/2011
Doc Name
Response to Inspection of 11/1/11
From
AMEC
To
DRMS
Inspection Date
11/1/2011
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. G. Russell Means <br />Environmental Protection Specialist <br />Division of Reclamation, Mining and Safety <br />101 South 3 Street, Suite 301 <br />Grand Junction, CO 81501 <br />November 21, 2011 <br />RE: Nuvemco, LLC's Monogram Mine, File No. M- 1978 -222UG <br />Response to Inspection of November 1, 2011 <br />AMEC Environment and Infrastructure <br />2000 S. Colorado Blvd., Suite 2 -1000 <br />Denver, Colorado 80222 <br />Tel +1 (303) 935 -6505 <br />Fax +1 (303) 935 -6575 <br />www.amec.com <br />Very truly yours, r r ^ � <br />AMEC E & I DEC <br />ame0 <br />AF ^: <br />and via email to Russ.Means @state.co.us <br />Dear Mr. Means, <br />We received the report of inspection of the Monogram Mines dated November 7, 2011. Based <br />on our discussions during your site visit, noting the minor erosion and sedimentation from the <br />staging area, Nuvemco staff installed erosion control measures on the November 2. As <br />documented in the following photographs, they placed about 50 feet of wattles across the low <br />part of the staging area and constructed an earthen berm further below as a temporary retention <br />basin until actual construction and mining begins. <br />This letter is response to the corrective actions required. Please advise if you need any further <br />information or documentation. <br />E. Thomas Cavanaugh, CPG, PG <br />Senior Geologist Energy Resources <br />NOV 2 1 2011 <br />=iCE <br />
The URL can be used to link to this page
Your browser does not support the video tag.