Laserfiche WebLink
Non - Roadable <br />Equipment <br />Roadable <br />E. ui .ment <br />0.10 <br />0.10 <br />0.10 <br />0.10 <br />1.00 <br />NA <br />1.00 <br />NA <br />2.20 <br />0.20 <br />Mobilization Worksheet Cont'd Task # 008 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: PAGOSA SPRINGS <br />Total one -way travel distance: 3.00 miles <br />Average Travel Speed: 30.00 mph <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Total Non - Roadable Mob /Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Total job time <br />$2,753.87 <br />$6.82 <br />Total job cost: $2,760.69 <br />4.40 Hours <br />CIRCES Cost Estimating Software <br />