Laserfiche WebLink
6MN MINE WATER TRANSFER PIPELINE (MR07-224) <br />RECLAMATION COST ESTIMATE <br />Facilities Demolition and Removal <br />Pump Station and Water Treatment Facilities Removal <br />Remove Pump Station - 2,000cf steel frame x $0.24/cf $ 480 <br />Plug and Stub-Off Pipes - 4 @ $200 800 <br />Remove Water Treatment Facility - 100sf of 6-inch concrete slab x $4.85/sf 480 <br />Powerline Removal <br />Remove Powerpoles - 3 poles x $500/pole 1 500 <br />Subtotal -Facilities Demolition and Removal $ 3,260 <br />Site Reclamation <br />Reclamation of Pipeline Disturbance -Reclamation occurs at the time the pipeline is installed <br />Backfilling, compaction, and grading -(jacking pits 0.12 acres @ $1,200/ac) 150 <br />Stream restoration - (30 lineal ft @ $100/ft) 3,000 <br />Topsoil replacement - (0.12 acres @ $1,000/ac) 120 <br />Revegetation - (0.12 acres @ $800/acre) 100 <br />Subtotal $3,370 <br />n <br />ICJ <br />• <br />Subtotal -Direct Costs $ 6,630 <br />Indirect and Administrative Costs (8%) $ 530 <br />Project Total Cost $ 7,160 <br />Notes: Costs from Means Site Work and Landscape Cost Data <br />MR07-224 1 ~ 11~ i ~ ~JCl ~ A-140 10/01/07 <br />