Laserfiche WebLink
• MR 00-168 CRUSHER BUILDING AT PREP PLANT <br />1 Buildin¢ <br />10404 CF @ $0.18/CF = $1873 <br />11 Foundation <br />Concrete Pad: 2 x 8' x 8' =128 ft= x $6.68 = $ 855 <br />Concrete Pad: 2 x 5' x 5' = 50 ft' x $6.68 = $ 334 <br />Concrete Pad: 3' x 3.5' = 10.5t= x $6.68 = $ 70 <br />Concrete Pad: 7' x 6' = 42 ft' x $6.68 = 28 ] <br />Total Foundation Removal = 51,540 <br />Subtotal = 53,413 <br />Admin (8%ojSubtota!) = 5 273 <br />Total Reclamation Costs jot MR 00.768 = 53,686 <br />// ~ <br />MR 00-168 85 03/15/00 <br />