My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-30_PERMIT FILE - C1982056A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2011-11-30_PERMIT FILE - C1982056A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:30 PM
Creation date
12/22/2011 10:02:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
11/30/2011
Section_Exhibit Name
Appendix A Bonding Calculations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />.. <br />PROJECT IDENTIFICATION <br />Task # : 61 B State :Colorado Permit/job# : C1982-056 <br />Date <br />User <br />09/10/2007 <br />JHB <br />Agency or organization name :CDRMS <br />Permit or otherjob action :TR61 <br />Task description :replace 12" topsoil on <br />HOURLY EQUIPMENT COST <br />County : Routt <br />Site : Foidel Creek Mine <br />footprint, pipeline corridor & access rd. corridc <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $64.72 NA <br /> Operating cost/hour : $98.84 100 <br /> Ripper op. cosUhour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $196.34 Total fleet cost/hour : $196.34 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 19, 795 C CY factor : 1.125 volume : 22,270 LCY <br /> <br />Source of estimated volume :p. 2.05-45.6f, 2.05-45.7, Map 24 & Exh. 490 <br />Source of estimated swell factor :caterpillar handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 2,110.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-rtJ <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6, 700 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2, 550 Ibs/LCY Net correction : 0.49 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 1042.41 LCY/hr <br /> Adjusted fleet production : 1,042.41 LCY/hr <br /> <br /> <br />JOB TIME AND COST _:: , -:: . <br />Fleet size : 1 Dozers) Total job time : 21.36 Hours <br />Unit cost : $0.188 /LCY Total job cost : $4 195 <br /> <br />Abbreviation :none <br />Filename : C056-618 <br />1'/~ G f ~ - 13 ~. 3 ~U S~ a ~-' <br />
The URL can be used to link to this page
Your browser does not support the video tag.