Laserfiche WebLink
ACCESS/HAULROAD SURFACING (MR 03-184) <br />ASPHALT REMOVAL <br />HAUL DISTANCE - 2160' <br />USE 637 SCRAPER <br />PRODUCTION - 400 CY/HR <br />HAUL 2400 CY <br />HOURS REQUIRED - 6 <br />COSTS <br />SCRAPER <br />$225.62/HR X 6 HR <br />ADMINSITRATIVE (19%) <br /> <br /> <br />$1,352 <br />257 <br />TOTAL $1,409 <br />PR 03-06 103 03/17/04 <br />