Laserfiche WebLink
Loader Worksheet Cont'd Task # 02A Page 2 of 2 <br />Load Bucket Capacity <br />Rated Capacity: 1.50 LCY (heaped) <br />Bucket Fill Factor: 0.925 Shale, Sandstone - Standing Bank ( 85% -100 %) 0.925 <br />Adjusted Capacity: 1.39 LCY <br />Job Condition Correction Factors <br />Site Altitude: 5800 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />1.00 <br />0.83 <br />0.83 <br />Source <br />(CAT HB) <br />(1 shift /day) <br />multiplier <br />Total Travel Time: 0.0739 minutes <br />Total Cycle Time: 0.6489 minutes <br />Unadjusted Hourly Unit Production: 128.30 LCY/Hour <br />Adjusted Hourly Unit Production: 106.49 LCY/Hour <br />Adjusted Hourly Fleet Production: 106.49 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 4.70 Hours <br />Unit cost: $0.807 /LCY Total job cost: $404.00 <br />CIRCES Cost Estimating Software <br />