Laserfiche WebLink
Non - Roadable <br />Equipment <br />Roadable <br />Equi. ment <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />0.50 <br />NA <br />0.50 <br />NA <br />3.00 <br />2.00 <br />Mobilization Worksheet Cont'd Task # 04A Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: RANGELY <br />Total one -way travel distance: 27.00 miles <br />Average Travel Speed: 27.00 mph <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Total Non - Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Total job time: <br />$6,781.14 <br />$24.82 <br />Total job cost: $6,805.96 <br />6.00 Hours <br />CIRCES Cost Estimating Software <br />