Laserfiche WebLink
December 16, 2011 <br />(A(1. Tim Cazier <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Permit No. Mj)80 -244; Cripple Creek & Victor Gold Mining Company ( "CC &V "); Cresson <br />Project — ResponYe to Adequacy Review Letter dated November 22, 2011 for Technical Revision ( "TR- <br />64") Process Solution Enhancement Circuit ( "PSE ") Liner System Construction <br />Dear Mr. Cazier: <br />Following receipt of CC &V's responses to the adequacy review you raised some additional concerns in <br />an e-mail to me on December 15, 2011 regarding: <br />(1) Stormwater as follows: "include a depression that would better contain runoff from a high <br />intensity storm." <br />(2) Scale issue on Drawing A100 as follows: "the LT scale representing the contact between the <br />old and the new liner on Drawing A100 was wrong so that there appears to be an intermittent <br />gap in that contact." <br />(3) The Title Block on the drawings needs to indicate "Revision 2 ". <br />The affected drawings have been revised and are enclosed for your further review and approval. <br />Please contact me at (719)- 689 -4056 should you have questions or wish to discuss this additional <br />adequacy review response for TR -64. <br />Sincerely, <br />&Mito-s- <br />Michael D. Ellis, PE <br />Chief Environmental Coordinator <br />Cripple Creek & Victor Gold Mining <br />A Joint Venture • ANGLOGOLD ASHANTI (COLORADO) CORP., Manager <br />Operations Office <br />P.O. Box 191 • 100 North 3` Street <br />Victor, Colorado 80860 <br />(719) 689 -2977 — Fax (7191689 -3254 <br />Sent Certified, Return Receipt Requested <br />7011 -1150- 0001 - 4440 -2964 <br />Enclosed in triplicate: Revised Drawings A100, A110, and A115 <br />