My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-20_HYDROLOGY - M1999069
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999069
>
2011-12-20_HYDROLOGY - M1999069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:46:20 PM
Creation date
12/20/2011 12:31:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999069
IBM Index Class Name
HYDROLOGY
Doc Date
12/20/2011
Doc Name
SWSP
From
OSE
To
Williams and Weiss Consulting, LLC
Permit Index Doc Type
Hydrology Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Todd Williams Page 3 <br />December 19, 2011 <br />applies to losses at another gravel pit, Kauffman Pit DRMS M- 1978 -327 (SWSP WDID 0402530). A <br />copy of the lease associated with the mining operation was provided to the State Engineer's Office with <br />the plan request and a copy of the lease is attached to this letter. The duration of the lease is from <br />January 1, 2010 through December 31, 2012. A 4 percent transit Toss from Green Ridge Glade <br />Reservoir to Wagner /Kauffman Pit No. 3 has been applied to the delivery of the replacement water. <br />Under the terms of the lease, replacements can be made using a variety of water owned by <br />Loveland including, but not limited to, Windy Gap reusable effluent, Loveland Storage Reservoir water <br />as decreed in case no. 82CW202A, and Colorado Big Thompson Project ( "C -BT ") water. In the event <br />that the City plans to use C -BT water as a replacement source, the City shall comply with the <br />Interim Rule issued by the Northern Colorado Water Conservancy District ( "Northern District ") in <br />May 2005, regarding the use of Colorado -Big Thompson ( "CBT ") Project water in substitute <br />water supply plans. Prior to the use of C -BT Project water, the City is required to notify this office, the <br />division engineer and the water commissioner of the amount of C -BT Project water dedicated to this <br />plan and provide a copy of the Northern District's approval letter as required by paragraph 1(g) of the <br />Northern District's May, 2005 Interim Rule. <br />The monthly depletion and replacement requirements are indicated on the attached Table 6. <br />Conditions of Approval <br />I hereby approve the proposed substitute water supply plan in accordance with §37 -90- 137(11), <br />C.R.S., subject to the following conditions: <br />1. This plan is approved with the effective date of January 1, 2012 and shall be valid through <br />December 31, 2012 unless otherwise revoked or modified. If this plan will not be made <br />absolute by a water court action by the plan's expiration date, a renewal request must be <br />submitted to this office with the statutory fee (currently $257) no later than November 15, <br />2012. <br />2. Well permit no. 65258 -F was obtained for the current use and exposed pond surface area <br />of the gravel pit in accordance with §37 -90- 137(2) and (11), C.R.S. <br />3. The total surface area of the groundwater exposed at the Wagner /Kauffman Pit No. 3 must not <br />exceed 0.16 acres resulting in 0.38 acre -feet per year of evaporative loss. <br />4. No amount of product shall be mined below the ground water table, and no aggregate washing <br />is permitted during this SWSP approval. <br />5. Total consumption at this site must not exceed these aforementioned amounts unless an <br />amendment is made to this plan. <br />6. Approval of this plan is for the purposes as stated herein. Any additional uses for which the <br />water may be used must first be approved by this office. <br />7. The replacement water that is the subject of this plan cannot be sold or leased to any other <br />entity. As a condition of subsequent renewals of this substitute water supply plan, the <br />replacement water must be appurtenant to this site until a plan for augmentation is obtained All <br />replacement water must be concurrent with depletions in quantity, timing and locations. <br />8. In the event Loveland plans to use C -BT Project water as a replacement source, Loveland shall <br />comply with the Interim Rule issued by the District in May 2005 regarding the use of C -BT Project <br />water in substitute water supply plans. Prior to the use of the C -BT Project water, Loveland shall <br />notify this office, the division engineer and the water commissioner of the amount of C -BT Project <br />water dedicated to this plan and provide a copy of the District's approval letter as required by <br />paragraph I(g) of the District's May, 2005 Interim Rule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.