My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-08_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2011-12-08_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2020 9:59:21 AM
Creation date
12/20/2011 11:08:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/8/2011
Doc Name
Second Park Lateral Relocation Piping
Section_Exhibit Name
Section 2.05.3(3) Attachment 2.05.3(3)-25
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2.05.3(3) -25 <br />Second Park Lateral Relocation Piping <br />Western Fuels- Colorado is planning to pipe and relocate part of the Second Park Lateral Ditch in <br />a 24" HDPE pipe. The attached map shows the extent of piping and relocation. Part of the <br />relocation will occur within the New Horizon Mine (NH1) permit boundary. The length of the <br />pipe within the permit boundary will be approximately 4,400 feet. The pipe will enter about 850 <br />feet north of the southeast corner of the permit boundary and continue within the permit <br />boundary parallel to AA Rd to the 2600 Rd, then follow the 2600 Rd toward north for about <br />1,250 feet to exit the permit boundary. <br />The pipe will mostly be laid on the surface. It might be buried or covered with soil mound in <br />locations used for traffic or required by topographic reasons. Silt fence or a comparable device <br />will be used to control storm runoffs. The pipe will eventually be removed and put back in the <br />current Second Park Lateral Ditch location within the proposed New Horizon North Mine permit <br />Boundary. <br />The expected construction period for the pipe installation is between December 2011 and April <br />2012. <br />
The URL can be used to link to this page
Your browser does not support the video tag.