Laserfiche WebLink
Spillway structures installed, and none are required <br />Impoundment Factor of Safety <br />A factor of safety calculation for the embankment on the south end of Pond 015 is unnecessary <br />for the following reasons: <br />1. Pond 015 is excavated entirely from sandstone bedrock. <br />2. The entire pond is incised in bedrock; there is no constructed dam. <br />3. The steepest slope in Pond 015 is 1 H:1 V, and is an internal slope. No external slope is less <br />than 2H:1 V. <br />4. The bedrock material is competent sandstone. A Cat D11 dozer with a ripper was required <br />to break out pieces of bedrock to be removed via loader and truck. <br />5. There is only 1.5 feet of soil on top of the embankment. This is the only consolidated <br />material in the embankment. <br />As can be seen in the following image, the excavation of Pond 015 is out of competent bedrock. <br />Therefore, analyses like the Bishop's Method of Slices are inapplicable (these methods are for <br />slopes of unconsolidated material). <br />(June 2011 TR -60) Attachment 2.05.3(3) -24 -2 <br />