My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-30_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2011-11-30_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:30 PM
Creation date
12/20/2011 9:18:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
11/30/2011
Doc Name
Collection/Diversion Ditches and Culverts Design Parameters
Section_Exhibit Name
Section 2.05.3(3) Attachment 2.05.3(3)-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CULVERT 114 <br />This 42" CMP is where the CC Ditch overflow crosses the access road to get to the HDPE pipe inlet from <br />2700 Road. The size of the culvert is based on the maximum ditch overflow. There is no drainage basin <br />into this culvert. <br />CULVERT 115 <br />This is the 42" pipe which contains the actual HDPE pipeline under the BB Detour Road. When the <br />detour is removed, this culvert will remain with a mound of dirt above it since the pipeline is permanent. <br />CULVERT 116 <br />This 18" CMP is actually an erosion control pipe allowing water from Ditch C11 to enter Pond 8 on its <br />incised steep embankment. The steepness of the pipe and the fact that the surrounding ground can <br />handle the overflow allows the 18" pipe to be acceptable in this case. <br />CULVERT 117 <br />This culvert will be permanent under BB Road at the Sunshine Ranch Corner. It will handle the peak <br />flows from Ditches C12 and C13. This is a combined peak flow of 38.8 cfs. A 36" CMP is needed. <br />CULVERT 118 <br />This culvert carries the peak flows from Ditches C1 And C2 under the BB Road. It is temporary until <br />reclamation is approved and the ditches will be removed. <br />CULVERTS 119 -128 <br />These culverts are 13" x 17" arched culverts of 35 feet length which are placed along the BB Detour <br />Road as required by the County. Since Ditch C1 captures almost all of the drainage area above the road, <br />very little drainage flows into these culverts, therefore, no design has been shown. The capacity of each <br />culvert is approximately 3.4 cfs. <br />CULVERT 129 <br />This 18" CMP will permanently carry the drainage from Basin 13 under the reconstructed BB Road. It is <br />sized fore the peak flow of 4.1 cfs from Ditch C24. <br />Revised June 2011 (TR -60) Attachment 2.05.3(3) -1 -79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.