Laserfiche WebLink
DITCH C27 <br />Time of Concentration (SCS Method) <br />Project: Pond 015 Drainage By: R. L. Gubka <br />Location: New Horizon Mine Checked: <br />Present <br />Curve Number: 79 <br />Length of Flow: 1963.63 ft <br />Average Land Slope: 6.50 % <br />Time of Concentration: 0.368 hrs, 22.1 mins <br />Date: 08/22/11 <br />Date: <br />DITCH C27 <br />Graphical Peak Discharge <br />Project: Pond 015 Drainage By: R. L. Gubka Date: 08/22/11 <br />Location: New Horizon Mine Checked: Date: <br />Present <br />1. Data: <br />Drainage area: .................... A = 6.1630 Acres <br />Runoff Curve Number: ............. CN = 79 <br />Time of Concentration: ........... Tc = 0.37 <br />Storm Type: ....................... = II <br />Pond and swamp areas spread <br />throughout watershed ............... = 0.00 percent of A <br />0.0000 Acres <br />2. Frequency ........................yr = 100 <br />3. Rainfall, P(24- hour) ..............in = 3.00 <br />4. Initial abstraction, la............ = 0.5316 <br />5. Compute la /P ....................... = 0.1772 <br />6. Unit peak discharge, qu ...... csm /in = 583.89 <br />7. Runoff ,Q .........................in = 1.1885 <br />8. Pond & swap adjustment factor .... Fp = 1.00 <br />9. Peak Discharge,gp ...............cfs = 6.6823 <br />Revised Aug 2011 JR-60) Attachment 2.05.3(3) -1 -46 <br />