My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-30_PERMIT FILE - C1981008A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2011-11-30_PERMIT FILE - C1981008A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:30 PM
Creation date
12/20/2011 8:28:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
11/30/2011
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3) Mine Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 2.05.3(3) <br />Mine Facilities <br />1. Introduction <br />This section contains a description of the proposed structures to be used in connection with or <br />to facilitate the surface coal mining and reclamation activities at the New Horizon 2 mine area <br />described in Section 2.05.3, Operation Plan: Permit Area. <br />Facilities approved for construction at the New Horizon 2 mine area by previous permit versions <br />and the current version are described in the following sections. Some of the facilities have not <br />yet been built. Construction of these will occur on an as needed basis consistent with the permit <br />requirements. <br />2. Sediment and Water Control Facilities Plan <br />Western Fuels- Colorado will use various types of structures to control the runoff from disturbed <br />areas within the permit boundaries at the New Horizon Mine. In addition, surface mining <br />activities will be planned and conducted to minimize disturbance of the prevailing hydrologic <br />balance in both the mine plan and adjacent areas in order to prevent long -term adverse changes <br />in the hydrologic balance. <br />Sediment control measures will include proper utilization of mining and reclamation methods and <br />sediment control practices singly or in combination. Sediment control methods may include, but <br />not be limited to the following: <br />1. Disturbing the smallest practicable area at any one time during the mining and <br />construction operation; <br />2. Stabilizing graded material to promote a reduction in the rate and volume of <br />runoff; <br />3. Retaining sediment within disturbed areas; <br />4. Diverting runoff awayfrom disturbed areas including stockpiles, backslopes, and <br />material storage; <br />(Revised June 2010) 2.05.3(3) -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.