Laserfiche WebLink
November 28, 2011 C-1981-012/New Elk Mine DIH <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5,4.05.6; Discharge Structures 4.05.7,4.05.10; <br /> Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage—Acid and Toxic Materials 4.05.8; Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18: <br /> During an on-the-ground inspection conducted by DRMS between I I/16/11 and 11/22/11, DRMS determined that <br /> some fills and culverts had been installed in some drainages immediately east of the new underground development <br /> waste pile without prior DRMS approval. An aerial inspection was conducted to provide better photographs of the <br /> scale of these structures. <br /> 1 <br /> Y <br /> 7 Z Zy <br /> w - r <br /> 4 <br /> SAE east of new UG development waste pile,with three unapproved fills with culverts in"clean water"drainages, <br /> looking from the northwest to the southeast. <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 8 <br />