Laserfiche WebLink
-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: CV- 2011 -006 <br />NATURE OF VIOLATION: <br />Failure to maintain culverts, ditches, and a_pond spillway <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT <br />SECTION(S) 34 33 121(2)(i)(II) <br />REGULATION <br />SECTION(S) _ 4. 05 .2(2)L4.05.3(1)(c),(d),andje); 4.05.3(4) <br />PERMIT <br />SECTION(S) Pp. 2.05 - 2.05 11;_2.05 -14; 2.05 14ALMaps13 &_14; Exhibit 19 (pond as built)_ <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />(1) Pond 4_emergency spillway jwillows in emergency spillway) <br />(2) Ditch D16 <br />(3) Ditch D30 <br />(4) Culverts in RDA access road <br />(5) 3rd_culvert in_C2_series of 3 "clean water" culverts west of "C &W Shop" area <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />1 Cut willows out of Pond 4 emer.enc s•illwa <br />(2) Remove_ sections of tubing from ditch <br />_(3) Remove_power_pole,shrubs, and boulder from ditch <br />_(4) Clean_out_culverts_along RDA access road <br />(5) Clean out 3rd culvert in series of 3 culverts <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE <br />(1) January 9, 2012 <br />(2) _January <br />(3) January 9,2012 <br />(4) January 9, 2012 <br />(5) January 9,_2012 <br />, 20 <br />NOV FORM (3/95) <br />WHITE - File YELLOW - Operator PINK — Specialist <br />