Laserfiche WebLink
-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: CV- 2011 -08 <br />NATURE OF VIOLATION: <br />Failure to have obtained final a royal of a Technical Revision for surface coal minin <br />II III <br />0 <br />erations <br />rior <br />to their im <br />lementation. Failure to have salva <br />ed <br />to <br />soil erior to <br />1 <br />1 <br />1 <br />1 <br />construction of two unapproved light use roads. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT <br />SECTION(S) 34 - - 116 <br />REGULATION <br />SECTION(S) 2.08.4(4); 4.06.1(1) <br />PERMIT <br />SECTION(S) None <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />(1 )New fill and culvert in drainage south of SH12, downstream of Pond 008 <br />2 New rock dam in drainage east of new DWDA waste rile <br />(3) New rock silt traps in SAE east of DWDA and southeast of Pond 007 <br />4 New li ht use road from to • of RDA to 100 ear RDA diversion ditch <br />(5) New light use_road east_of_RDA <br />(6) New light use_road to new slurry hole drill_pad <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />fl ) remove fill and culvert <br />(2 )_remove dam <br />3 remove both rock silt Crass• fill in ditch near southeast corner of Pond 007 <br />4 stabilize li ht use road with switchbacks east of RDA with an a <br />II <br />5 obtain final a <br />roved seed mix <br />royal of a TR for all new roads sed control s stems culverts and fills <br />II • <br />subject to this NOV <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE <br />(1) January 9 <br />(2) January 9, 2012 <br />(3) January 9 2012 <br />(4) Janaary 9,_2012 <br />(5) J 92012 <br />NOV FORM (3/95) <br />WHITE - File <br />, 20 <br />YELLOW - Operator PINK - Specialist <br />