Laserfiche WebLink
-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: CV- 2011 -08 <br />NATURE OF VIOLATION: <br />Failure to have obtained final a royal of a Technical Revision for surface coal minin <br />II <br />operations _prior to their implementation. Failure to have salvaged topsoil_prior to <br />construction of two unapproved_ light use roads. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT <br />SECTION(S) 34 -33 -116 <br />REGULATION <br />SECTION(S) 2.08.4(4):,4 <br />PERMIT <br />SECTION(S) None <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />1 New fill and culvert in draina e south of SH12 downstream of Pond 008 <br />(2) New rock dam in drainage east of new DWDA waste_pile <br />(3)_New rock silt traps in SAE east of DWDA and southeast of Pond 007 <br />(4)_New light use road from top of RDA to 100 year RDA diversion ditch <br />(S)_New_light_use road east of_RDA <br />(6) New_light_use_road to new slurry hole drill_pad <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />(1) remove fill and culvert <br />(2) remove dam <br />3 remove both rock silt traps• fill in ditch near southeast corner of Pond 007 <br />4 stabilize li ht use road with switchbacks east of RDA with an a <br />5 obtain final a <br />roved seed mix <br />royal of a TR for all new roads sed control s stems culverts and fills <br />II II <br />sub ect to this NOV <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE <br />1) Jan uary 92012 <br />(2) January 92012 <br />(3) January 9.2012 <br />(4) Janaary 9, 2012 <br />(5) January 9, 2012 <br />NOV FORM (3/95) <br />WHITE - File <br />, 20 <br />YELLOW - Operator PINK - Specialist <br />