Laserfiche WebLink
November 16, 2011 C-1981-012/New Elk Mine DIH <br /> DOCUMENTS RECEIVED: None <br /> OTHER(SPECIFY): <br /> This was a Complete inspection conducted from 11/16/11 through 11/22/11. Ron Thompson and Bobby Steele <br /> were present at different times during the inspection. Coal was being trucked in and stockpiled at the loadout. <br /> Some trash needs to be picked up at the loadout. No problems were noted at the two Apache Canyon airshafts. <br /> Maintenance Items that were not considered to be violations at the time of the inspection: <br /> 1. Non-coal waste near West Portal needs cleaning up/placement in appropriate storage area: <br /> r <br /> 2. An appropriately-sized culvert may need to be considered for placement in ditch D29 where the new light <br /> use road to the new slurry injection well drill pad crosses the ditch(no picture). <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 6 of 16 <br />