My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-15_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2011-12-15_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:46:09 PM
Creation date
12/15/2011 11:30:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/15/2011
Doc Name
Response to Adequacy Review
From
CC&V
To
DRMS
Type & Sequence
TR64
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 15, 2011 <br />Dear Mr. Cazier: <br />Cripple Creek & Victor Gold Mining <br />A Joint Venture • ANGLOGOLD ASHANTI (COLORADO) CORP., Manager <br />Operations Office <br />P.O. Box 191 • 100 North 3`" Street <br />Victor, Colorado 80860 <br />(719) 689 -2977 — Fax (719) 689 -3254 <br />HAND - DELIVERED <br />(. ) i') <br />zEADESL <br />Mr. Tim Cazier <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Permit No. i 1- 1980 -244; Cripple Creek & Victor Gold Mining Company ( "CC &V "); <br />Cresson Project; — 4esponse to Adequacy Review Letter dated November 22, 2011 for Technical <br />Revision ( "TR -64 ") Process Solution Enhancement Circuit ( "PSE ") Liner System Construction <br />C15211 <br />(Division of Recta: n mon, <br />740 Whin 14 LIz•.' iy <br />The following narrative addresses DRMS's concerns with TR -64 as outlined in your letter of <br />November 22, 2011. <br />#1. An updated Drawing C -4 was not included in the submittal. Please provide an updated <br />Drawing C -4. <br />Response: Prior to receipt of the adequacy review letter, CC &V submitted to DRMS on <br />November 24, 2011 the requested drawing via regular U. S. mail and should have arrived <br />at DRMS's office on Monday, November 28 or earlier. <br />#2(a). The drawings ( #A100, A105, A110, A115, Al20, and Al25) do not show the existing <br />Phase 1 liner anchor trench beyond the intersection of the existing anchor trench and the <br />proposed liner anchor trench. For the purpose of clarification, please show /extend the existing <br />Phase 1 liner anchor trench beyond the intersection of the two anchor trenches (i. e., towards the <br />northwest). <br />
The URL can be used to link to this page
Your browser does not support the video tag.