Laserfiche WebLink
EXHIBIT L <br />Reclamation Costs <br />• Maximum pit depth and acreage of pit excavation: <br />Total maximum depth will be 12 feet; total acreage will be 19.06 Acres. <br />• Volume of stockpiled overburden materials and distance from pit excavation <br />Overburden materials will be 3,630 cubic yards, materials will be placed 2 -8 feet <br />from the excavation site. <br />• Volume of stockpiled topsoil materials and distance from pit excavation <br />Top soil materials will be 610 cubic yards, the materials will be placed 2 -8 feet <br />from the excavation site. <br />• Volume of plant growth materials and distance from pit excavation <br />Plant growth materials will be 610 cubic yards, the material will be placed 6 feet <br />from the excavation site. <br />• Volume of any other plant growth materials on -site and distance from pit <br />excavation _ <br />N/A <br />• Acreage to be re- vegetated <br />19.06 Acres <br />Glenn E. Sessions and Sons, Inc. Estimates that it will cost them $25,420.00 to reclaim <br />the Fair Banks Pit. <br />