My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-12_REVISION - M1986015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2011-12-12_REVISION - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:23 PM
Creation date
12/13/2011 2:14:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
REVISION
Doc Date
12/12/2011
Doc Name
New pg. 1 and Addition to Ex. D- email
From
Gary Tuttle
To
DRMS
Type & Sequence
AM4
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 12, 2011 <br />M- 1986 -015 Pueblo East Pit Amendment 4 <br />Adequacy Response <br />Exhibit D Mining Plan <br />If the mining face on the east side of Phase 7 failed, this failure could cause a failure in a <br />section of the west berm of the drainage channel. If a major rainfall event occurred while <br />the berm was down, the stormwater would enter the pit. Thus the pit would be partially <br />or mostly filled with turbid stormwater. <br />Transit Mix would first notify the DRMS of the event. <br />After repairing the mining face and channel berm section, Transit Mix would pump the <br />water in the pit into the settling basin in Phase 7. After adequate settling time, the water <br />would be pumped in the River. To shorten the time needed to pump out the pit, Transit <br />Mix could also pump the water into the settling basin in Phase 1. <br />This plan would require notification of the Water Quality Control Division of the <br />CDPHE and a temporary revision to the NPDES permit to allow a greater amount of <br />water to be discharged per day. <br />C: \Users \Gary\Documents \Job Projects \Transit Mix_Cont Materials\Pueblo East \Proposal Pit <br />Expansion \DRMS\Adequacy response \11 -12 -12 Exh D water pump out.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.