Laserfiche WebLink
Task description: <br />Site: Schmidt Site <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />001 <br />12/5/2011 <br />KAP <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D5K XL - 5P <br />Horsepower: 96 <br />Blade Type: Power Angle Tilt <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />Average push gradient: <br />Average site altitude: <br />Cut highwalls <br />$87.44 <br />$87.44 <br />MATERIAL QUANTITIES <br />4,900 <br />1.250 <br />6,125 LCY <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />-30 % <br />7,000 feet <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />State: Colorado <br />County: Archuleta <br />$15.73 <br />$33.23 <br />$0.00 <br />$38.49 <br />BULLDOZER WORK <br />Permit Action: New Permit Third <br />Option <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Unadjusted hourly production: 464.3 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Material weight: 2,550 lbs /LCY <br />Weight description: Earth - Dry packed <br />0.750 <br />0.900 <br />Source <br />(AVG.) <br />(CAT HB)) <br />Abbreviation: None <br />Page 1 of 2 <br />Permit/Job #: M2011014 <br />Filename: MO14 -001 <br />CIRCES Cost Estimating Software <br />