Laserfiche WebLink
. Sewage Package Treatment Plant <br />The sewage package plant includes a tank and a building. <br />The building is a metal building with a concrete slab foundation. <br />The plant is located east of the preparation plant on Map 11, Sheet 3 —East Portal Facilities. <br />Site Plan Area: Sewage Treatment Plant <br />Sludge and Treatment Plant <br />Item Concrete Pond Contamination Units <br />Length (ft) <br />Width (ft) <br />Depth/height (ft) <br />Quantity <br />40 <br />1 <br />1 <br />10000 <br />Units <br />CY <br />32k GAL <br />32k GAL <br />LBS <br />Unit cost <br />$74 <br />$11,850 <br />$7,782 <br />$0 <br />Total direct cost <br />$2,960 <br />$11,850 <br />$7,782 <br />$1,330 <br />Job supervision hours <br />8 <br />9 <br />10 <br />11 <br />Job supervision Cost <br />$333 <br />$375 <br />$417 <br />$458 <br />Profit, insurance, and bond <br />$387 <br />$1,549 <br />$1,017 <br />$174 <br />Contract <br />$3,680 <br />$13,774 <br />$9,216 <br />$1,962 <br />Engineering <br />$156 <br />$585 <br />$392 <br />$83 <br />Reclamation management <br />$184 <br />$689 <br />$461 <br />$98 <br />Estimated bond <br />$4,021 <br />$15,048 <br />$10,069 <br />$2,144 <br />• <br />TR 54 Exhibit 28 —Page 143 Revised 11 -03 -2010 <br />