Laserfiche WebLink
0 Permanent Drive <br />The temporary conveyor drive at the east belt portal will be replaced with a permanent 60 -inch drive. <br />The drive has a concrete foundation and metal housing. <br />Refer to Figures 8 through 10 for details of the structures. <br />The drive is located outside the east slope belt portal on Map 11, Sheet 3-East Portal Facilities. <br />Site Plan Area: Permanent Slope Belt Drive <br />Length (ft) <br />45 <br />Width (ft) <br />37 <br />Depth/height (ft) <br />5 <br />308 <br />1000 <br />1000 <br />75 <br />7412 <br />Quantity <br />CY <br />LF <br />LF <br />LF <br />CF <br />Units <br />$74 <br />$38 <br />$38 <br />$38 <br />$0.13 <br />Unit cost <br />Total direct cost <br />$22,817 <br />$37,836 <br />$37,836 <br />$2,837 <br />$986 <br />Job supervision hours <br />8 <br />9 <br />10 <br />11 <br />11 <br />Job supervision cost <br />$333 <br />$375 <br />$417 <br />$458 <br />$458 <br />Profit, insurance, and bond <br />$2,982 <br />$4,945 <br />$4,945 <br />$371 <br />$129 <br />Contract <br />$26,132 <br />$43,156 <br />$43,198 <br />$3,667 <br />$1,573 <br />Engineering <br />$1,111 <br />$1,834 <br />$1,836 <br />$156 <br />$ <br />Reclamation management <br />$1,307 <br />$2,158 <br />$2,160 <br />$183 <br />$ <br />Estimated bond <br />$28,549 <br />$47,148 <br />$47,194 <br />$4,006 <br />$1,719 <br />u <br />11 <br />TR 54 Exhibit 28 —Page 139 Revised 11 -03 -2010 <br />