My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-09_REVISION - C1981012 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2011-12-09_REVISION - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:46:00 PM
Creation date
12/12/2011 8:25:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
12/9/2011
Doc Name
Adequacy Response No. 1
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
MR101
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINE ENGINEERING <br />MINE RECLAMATION <br />December 7, 2011 <br />J. E. STOVER & ASSOCIATES, INC. <br />Zach Trujillo <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Dear Mr. Trujillo: <br />2352 NORTH 7 STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245- 4101, FAX 242 -7908 <br />Re: New Elk Mine Permit C- 1981 -012 <br />Minor Revision Application No. 101 <br />RDA Conveyor Temporary Loading Point <br />Adequacy Response No. 1 <br />liteco <br />pEC '3g 1011 a ,on, <br />Div;svon o' K a Sa Safety <br />�tn►n9 and <br />ENGINEERING <br />CONST. MANAGEMENT <br />The DRMS' letter dated November 8, 2011 transmitted its adequacy response for the referenced <br />minor revision. On behalf of New Elk Coal Company, (NECC) following are its responses to the <br />DRMS' comments and concerns. <br />1. Enclosed is Map 11 Sheet 3 that shows the belt feeder and conveyor. Map 11, Sheet 2 is <br />not required for this revision. <br />2. A reclamation estimate for the belt feeder and conveyor is provided as Exhibit 28. <br />3. Amended page 2.05 -4a has a short discussion of the transfer belt system. <br />4. The belt feeder, transfer belt and elevating conveyor were added to the surface facilities <br />list on page 2.05 -6a (Table 19). <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Ron Thompson, NECC <br />Mike Trujillo, CDOW <br />Attachments: (3) <br />MR -101 Adequacy letter dated December 7, 2011 <br />MR -101 Page 2.05 -4a Revised December 7, 2011 <br />MR -101 Page 2.05 -6a Revised December 7, 2011 <br />MR -101 Exhibit 28 Bond Estimate dated December 7, 2011 <br />MR -101 Map 11 Sheet 3 Revised December 7, 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.