DESIGN CRITERIA
<br />Code:
<br />Location:
<br />Jurisdiction:
<br />Occupancy Category.
<br />Floor Uwe Loads
<br />Roof Live Loads:
<br />Wind:
<br />Seismic:
<br />GENERAL CONDITIONS AND REQUIREMENTS
<br />International Building Code (IBC). 2009 Edition
<br />Parchall, CO
<br />Grand County
<br />Mechanical Access
<br />Mechanicd Equipment
<br />Ground Snow, Pg
<br />Snow Exposure. Ca
<br />Snow Importance
<br />Thermal Factor. Ct
<br />Flat Root Snow. Pf
<br />Velocity (3 sec. gust)
<br />Exposure
<br />Wind Importance
<br />Internal Pressure Coefficient
<br />Component /Cladding
<br />Component /Cladding loads
<br />Spectral Response S.
<br />Spectral Response S1
<br />Site Class
<br />Spectral Response SDS
<br />Spectral Response SDI
<br />Selemlc Importance
<br />Seismic Design Category
<br />Force Resisting System(s)
<br />Response Coeff. CS
<br />Analysis Procedure
<br />Design Base Shear
<br />75 pet uniform
<br />Noted on drawings
<br />70 pet (el. 9176' -6')
<br />1.0
<br />1.0
<br />1.0
<br />70 pef
<br />90 mph
<br />C
<br />1.0
<br />±0.18
<br />±30.4 psf at enclosed walls
<br />±51.9 pet at enclosed roots
<br />±43.0 psi at roof overhangs
<br />for other areas are subject to review
<br />0.267 g
<br />0.065 g
<br />B
<br />0.178 9
<br />0.043 g
<br />1.0
<br />Steel OMRF
<br />Equivalent Lateral Force
<br />Cs x W
<br />1. The use of these drawings constitutes a contractual agreement between the Contractor
<br />and the Owner. Thus, these Contract Documents take precedence over trade practices
<br />and third party specification..
<br />2. The term Engines shdl be taken to mean the Structural Engineer of Record. Third
<br />part entitles are specifically noted as 'Professional Engineer, 'Contractor'e Engineer;
<br />Designer; etc.
<br />3. Contractor is responsible for obtaining access to all codes, standards specifications,
<br />reports, third party literature, etc. referenced In these documents.
<br />4. Contractor shall field measure and verify all existing conditions and dimensions at job
<br />site. In the event that existing conditions or dimensions wry from those shown on
<br />the drawings, Contractor shall notify the Engineer so proper adjuatmente can be made.
<br />5. Contractor shall check and verify all dimensions and other Information shown on
<br />structural drawings with those shown on non - structural drawings. Including
<br />architectural and other disciplines. Contractor shall notify the Engineer of any
<br />dlscrepanclea between structural and non - structural drawings. or within structural
<br />drawings Where euch discrepancies occur, the most stringent requirements shall
<br />govern unless written clarification Is obtained from the Engineer.
<br />6. All Contractors, Subcontractors, Fabricators, Suppliers and other Jobslte personnel shall
<br />of all times comply with the Occupational Safety and Health Administratlon `OSHA)
<br />Standards - 29 CFR, Parts 1910 Occupational Safety and Health Standards) and
<br />1926 ('Safety and Health Regulation, for Constriction ).
<br />7. Drawings represent a finished product. and do not address the means and methods
<br />necessary to complete the construction. During erection of the structure, the
<br />Contractor shall be responsible for temporary bracing to withstand all loads to which
<br />the structure may be subjected. Including lateral loads. stockpiles of materials and
<br />equipment. Such bracing shall be left In place as long as required for safety. and
<br />until all structural framing and diaphragms are In place with connections complete.
<br />8. The term provide' as used herein shall mean that Contractor shall furnish and
<br />Install sold item, Including all construction. equipment, materials, etc., for a complete,
<br />finished Installation.
<br />9. Installation of proprietary products shalt comply with all manufacturers specifications
<br />and recommendations, unless noted otherwise. Product substitutions shall be subject
<br />to Engineers review.
<br />10. Detaile noted 'typical' apply to all comparable conditions. Where no specific details
<br />are shown, construction shall conform to the comparable work defined elsewhere on
<br />the project.
<br />11. Deviations from these Contract Documents are not permitted. unless coordinated with
<br />the Architect or Engineer.
<br />12. Third Party Quality Control: Contractor shall provide Engineer with copies of all third
<br />party structural field observation reports and test results immediately upon receipt.
<br />13. Third Party Engineered Systems: All references to 'Professional Engineer' or 'P.E'
<br />shall be taken to mean a Professional Engineer currently registered In the project's
<br />Jurisdiction with experience In the specific discipline of the engineered system.
<br />14. Construction documents are copyrighted and shall not be reproduced without written
<br />authorization from the Engineer.
<br />15. Iteme requiring review by the Engineer, such as shop drawings. product substitutions,
<br />requests for field obeervatlons, etc., shall be brought to the Engineers attention with
<br />sufficient notice to allow the Engineer a reasonable review period.
<br />16. The Engineer's scope of services does not Include design and /or analysis of conditions
<br />resulting from Contractor errors or changes, nor does It include review of reissued
<br />submittals that were originally rejected. in these cases, the Contractor shall be
<br />subject to reimbursing the Owner for additional services incurred by the Engineer.
<br />17. Structural drawing. are not stand -alone documents and are intended to be used In
<br />conjunction with Civil. Architectural. Mechanical and Electrical drawings, plus all
<br />drawings from other disciplines. Structural materials that are used in non - structural
<br />applications are subject to the Structural General Note,. The Contractor shall
<br />coordinate ail requirements of the Contract Documents Into the Work
<br />18. Coordinate size and location of all openings. biodrouts, floor depressions, curbs, etc.
<br />with Civil, Architectural, MechanIcal, Electrical drawings, etc. as applicable, and reinforce
<br />these Items as shown on the Structurd drawings, or as required by Code. Holes,
<br />notches, blockouts etc. are prohibited In structural members unless specifically shown
<br />on the drawing, or coordinated with the Engineer.
<br />19.0o not scale drawings.
<br />20.See architecturd drawing, for non- etructurd partitions. Non - structural partition
<br />shall be Installed with slip connections that permit framing live load deflections of
<br />L/240.
<br />21. %here discrepancies exist among Drawings, General Notes and Specifications, the most
<br />stringent requirements shall govern.
<br />22.These General Notes provide supplemental information to that presented In the
<br />Specifications. See Specifications for additional information and requirements.
<br />FOUNDATION
<br />1. See Geotechnical Report Number DN44,981 -125, dated June 25, 2010, prepared by CTL
<br />Thompson, Inc., for additional information and requirements.
<br />2. Assumed sell capacities for use with mlcropiles:
<br />Maximum end bearing = 75,000 pef.
<br />Maximum side friction in bedrock formation = 6,000 pef.
<br />3. A Geotechnical Engineer must be present while microplee are being drilled to
<br />determine bedrock elevation, and to review placement of reinforcement. Concrete shall
<br />be placed as soon as as possible after pier excavation Is complete, but not until
<br />approval by Geotechnical Engineer.
<br />4. The center of micropile shall not deviate from the required position by more than
<br />1 l/2' and mlcroplles shall not be out of plumb by more than 1 to 100. All mlcrapile
<br />excavations shall be dean and dewatered before placing concrete. If this Is not
<br />possible, concrete shall be tremied below the standing water. Any casing used during
<br />the drilling shall be pulled as concrete is being placed.
<br />5. No concrete shall be poured In excavation containing water or on frozen ground.
<br />6. Backfill shall be placed against both sides of walls simultaneously. Use only hand -
<br />operated tools for compaction adjacent to foundation walla. Do not bac ttl until
<br />building walls have cured a minimum of 7 days.
<br />7. Refer to Geotechnical Report, Architectural Drawings and /or Civil Drawings for complete
<br />site grading, drainage, subgrode preparation and engineered fill requirements. Slope
<br />exterior grades away from foundation In all directions. All roof downspouts and drains
<br />shall discharge well beyond the limits of all backfill, and not be allowed to pond
<br />adjacent to the building.
<br />8. At slabs -on -grade, locate slip joints at all partitions in accordance with Geatechnlcal
<br />Report.
<br />9. Slabs -on -grade shall be isolated from foundation with 1/2' expansion Joint material.
<br />CONCRETE
<br />1. Material and workmanship shall be In accordance with the requirements of 'Building
<br />Code Requirements for Reinforced Concrete' (ACI 318, latest edition), and
<br />'Specifications for Strucutral Concrete' (ACI 301, latest edition).
<br />2. Concrete shall have a minimum compressive strength (fc) at the age of 28 days as
<br />follows:
<br />All slabs 4000 psi
<br />All foundation walls 4000 pal
<br />All micropiles 5000 pal
<br />Concrete exposed to freeze -thaw cycles shall have an air content of 4-6X. Concrete
<br />shall be normal weight (145 pct), unless noted otherwise.
<br />3. All cement used In foundations shall conform to ASTM C 150 Type II.
<br />4. All concrete shall have a minimum cement content of 470 lbs. per cubic yard, unless
<br />noted otherwise. Cement shall consist of no more than 20% fly ash.
<br />5. Calcium Chloride shall not be added to concrete.
<br />6. Reinforcing bare shall be deformed bars and shall conform to ASTM A 615, Grade 60.
<br />unless noted otherwise. All stirrups and column ties shall conform to ASTM A 615,
<br />Grade 40. Weldable reinforcement shall conform to ASIA A 706, Grade 80.
<br />7. Reinforcing bars shall be detailed on the shop drawings in accordance with the
<br />American Concrete institute 'ACI Detailing Manual' (ACI SP -66, latest edition), unless
<br />noted otherwise.
<br />8. Welded wire fabric shall conform to ASTIR A 185, shall lap a minimum of one full mesh
<br />plus 2 Inches at side and and laps, and Mall be securely wired together. unless noted
<br />otherwise.
<br />9. Cant -in -place steel anchor bolts shall conform to ASTM F 1554, Grade 38, unless
<br />noted otherwise.
<br />10. Bar bending details and placing drawings shall be In accordance with the 'Manual of
<br />Standard Practice for Detailing Reinforced Concrete Structures' (ACI 315, latest edition).
<br />11. Bar supports, chairs, spacer. and rebar positioners shall be used to place all bare in
<br />the exact location specified on the drawings. Wire adequately at intersections to hold
<br />bars firmly In position while concrete is placed.
<br />12. Bar supports, chairs and spacers which rest on or against an exposed surface shall be
<br />hot - dipped galvanized.
<br />13. Continuous bare Mall lap and dowels shall protect adequately to provide a Class B
<br />splice. but not less than 12 Inches, unless noted otherwise.
<br />14. Stirrups, ties, footing dowels and cantilevered reinforcement shall terminate in a
<br />standard hook at the free end(s) of the bar, unless noted otherwise.
<br />15. Where lap splice locations of horizontd bare are not spedflcdly noted on the drawings,
<br />lap splices are to be staggered.
<br />16. Concrete cover for reinforcement shall be as follows, subject to the tolerances of ACI
<br />117, unless noted otherwise:
<br />A. Concrete poured against earth 3'
<br />B. Concrete poured In forms but exposed to weather or earth
<br />(1.) #5 bars or smaller 1 1/2'
<br />(2.) Bars larger than #5 2'
<br />C. Columns, girders and beams (principal reinforcement, ties
<br />and stirrups) 1 1/2'
<br />D. Robe and walls 3/4'
<br />17. See architectural, mechanical and electrical drawings for additional openings.
<br />depressions, curbs, floor finishes, Inserts and other embedded Items.
<br />18. When other reinforcing is not required by the drawings. (2) #5 ban shall be located
<br />at all sides of, and adjacent to, every opening that exceed, 24' In either direction.
<br />Extend ban 24' beyond each side of opening.
<br />19.Unleee noted otherwise, di concrete slabs are to be reinforced with W.W.F. 606 -
<br />W1.4xW1.4. centered In slab depth.
<br />20. Where welded reinforcement or deformed bar anchors are Indicated on the drawings,
<br />steel specifications and welding shall conform to the 'Structural Welding Code -
<br />Reinforcing Steel' (AWS D1.4, latest edition) of the American Welding Society.
<br />GENERAL NOTES
<br />MASONRY
<br />1. Material and workmanship shall be In accordance with the requirements of the 'Building
<br />Code Requirements for Masonry Structures' (ACI 530, latest edition). and the
<br />'Specification for Masonry Structures' (ACI 530.1, latest edition).
<br />2. All masonry block units shall be lightweight (105 pcf) and conform to AST I C 90, with
<br />a minimum net area compressive strength of 1900 psi.
<br />3. Mortar for all masonry wails shall conform to ASIA C 270, Cement -Lime Type S. with
<br />a minimum compreaaln strength of 1800 pal at the age of 28 days.
<br />4. All grout shall attain a minimum compressive strength (re) of 3000 pal at the age of
<br />28 days. Grout shall be proportioned by volume and shall haw sufficient water added
<br />to produce consistency for pouring without segregation.
<br />A. Coarse grout shall be composed of one part portiand cement, 2 1/4 to 3
<br />parte sand. and 1 to 2 parts pea grovel.
<br />B. Fine grout shall be composed of one part portland cement, and 2 1/4 to
<br />3 parts sand.
<br />5. All masonry shall develop 1500 psi ultimate compressive strength (fm) at the age of
<br />28 days. Compressive strength shall be verified by prism tests In accordance with
<br />Chapter 17 of the International Building Code.
<br />6. Reinforcing steel shall be deformed bare conforming to ASTM A 615, Grade 60. unless
<br />noted otherwise.
<br />7. Minimum horizontal reinforcing shall be Dur- o-Wail '#9 gage Ladur -Type bed joint
<br />reinforcing of 16' c.c., or approved equivalent, and shall conform to ASTM A 82.
<br />6. Reinforcing steel lap splices shall be as follows: 29' for /4 bars, 45' for #5 bare and
<br />65' for #6 bars. unless noted otherwise. For Grade 40 bare, lap splices are permitted
<br />to be two-thirds of the above lengths.
<br />9. Shop Drawings. Contractor shall submit shop drawings for steal reinforcement showing
<br />each piece, Its size, length and location. Include wall elevations and /or sections
<br />howing proposed splice locations and lap lengths.
<br />10. Vertical cells to be grouted shall have a vertical alignment to maintain a continuous
<br />unobstructed call area not leas than 3'4' for 6' units 5'x5' for 8' unite, and 9'x5'
<br />for 12' units.
<br />11. Reinforcing steel shall be In place and Inspected before grouting starts. All debris and
<br />mortar shall be cleaned out before pouring grout. Cleanout openings shall be located
<br />at the bottom of all cells to be filled of each pour of grout In excess of five feet in
<br />height. Reber poslaoners shall be used at top and bottom of reinforcing bars and at
<br />apacings not to exceed 10' -0' when grout pour is in excess of five feet in height.
<br />12. When a foundation dowel does not line up with the vertical core to be reinforced, it
<br />shall not be bent over, but shall be grouted into a core in direct vertical alignment,
<br />even though It Is an adjacent cell to the vertical wall reinforcing.
<br />13. Celle containing reinforcement shall be solidly filled with grout In lifts not to exceed
<br />6' -0' and pours not to exceed 24' -0'. Pours shall be stopped 1 1/2' below the top
<br />of a course to form o key at pour joints. Grout shall be consolidated at time of
<br />pouring by mechanical vibration and then reconsolidated by again vibrating within 5 to
<br />8 minutes of initial consolidation.
<br />14. Where other reinforcing is not required by the drawlnps, locate (2) #5 bars at all sides
<br />of, and adjacent to, every opening which exceeds 24 in wither direction. Extend bare
<br />24' beyond each side of the opening.
<br />15. All interior masonry partitions shall be reinforced with /4 vertical bars at 8' -0' o.c..
<br />with slip joints at 4' -0' 0.0. maximum, unless noted otherwise.
<br />16. Bond beams are required at top and bottom of all openings (continued 2' -6' beyond
<br />each side of opening), along all diaphragms, at top of wall and at 8' -0' o.c. max.
<br />Reinforce with (2) #5 unless noted otherwise. Bars to be continuous around corners.
<br />17. Grout solid all cells and courses a distance of 24' below and 12' each side of all
<br />beam reactions and concentrated loads, unless noted otherwise.
<br />18. Vertical control joints shall be located within 16' of corners and at 20' -0' o.c. max.
<br />Control joints shall not be located within 16' of openings
<br />STRUCTURAL STEEL
<br />1. All detailing, fabrication and erection shall conform to American institute of Steel
<br />Construction Specifications for Structural Steel Buildings' (RISC 360) and the 'Code
<br />of Standard Practice for Steel Buildings and Bridges' (AISC 303), latest editions. All
<br />bolting shall conform to the Research Council on Structural Connections 'Specification
<br />for Structural Joints Using AS1M A325 or A490 Bolts' (RCSC A.1), latest edition.
<br />2. All steel shall conform to the following ASTM standards, unless noted otherwise:
<br />All steel not otherwise shown ASTM A 36
<br />W and VAT shapes AS11A A 992
<br />Steel Tubing ASTM A 500, Grade B
<br />Steel Pipe AS1M A 53 (Type E or 5), Grade B
<br />3. Structural steel bolts shall conform to ASTM A 325, heavy hex. Nuts shall conform to
<br />ASTM A 563, heavy hex. Washers shall conform to ASTM F 436. Bolted assemblies
<br />shall be 3/4'11 unless noted otherwise.
<br />4. Bolted connections shall be snug tight, unless noted otherwlee.
<br />5. All welding shall conform to the American Welding Society 'Structural Welding Code'
<br />(AWS D1.1), latest edition. Welding shall be performed with E70xx electrodes unless
<br />noted otherwise.
<br />6. All steel shall receive one shop coat of fabricators standard primer, such as Tnenec
<br />10-99 or Rust-Oleum 1069 red metal primer, except at areas to be field welded.
<br />7. Areas within 2 Inches of field welds shall not be painted until after welding. Field
<br />welds, bolt heads, nuts all other surfaces not shop pointed, and all surfaces that
<br />become abraded during shipping and erection shall be field painted Immediately after
<br />erection.
<br />8. Shop connections shall be welded unless noted otherwise.
<br />9. All welding shall be done by certified welding operators, who each have In their
<br />possession current evidence of passing the American Welding Society Standard
<br />Qualifications Tests' as detailed In ANS D1.1. Welding certificates shall be submitted
<br />to the Engineer for each welder before field welding commences.
<br />10. Weld sizes not otherwise shown shall be minimum continuous 5/16 Inch fillet welds.
<br />11. Heat - Induced field fabrication (including, but not limited to, holes, coping and trimming
<br />of steel members) shall be prohibited unless specifically coordinated with Engineer.
<br />12. The Engineer shall be notified whenever base metal discontinuities, fit -up and
<br />alignment problems, field welding problems, or member length or hole alignment Issues
<br />are Identified during erection of the building. Written clarification must be obtained
<br />before proceeding with field modification. of the structural steel.
<br />13. Non - shrink grout shall conform to ASTM C 1107, with a minimum ultimate compressive
<br />strength of 5.000 psi at the age of 28 days.
<br />14. Substituted beam connections shall be subject to review by Engineer. Shear
<br />connection, shall conform to Part 10 of the AISC 'Steel Construction Manual; latest
<br />edition. Moment connections shall conform to Part 12. All substituted connections
<br />must develop the full capacity of the connections specified on the structural drawings.
<br />15. Grating shall be welded rectangular design, steel. Main bars to be 1' x 3/16', spaced
<br />at 1 3/16' center to center. Cross bare are to be spaced at 4' o.c. Grating to be
<br />fastened to each steel support beam with 3/16' x 1' fillet weld at 24' o.c.
<br />16. Stair treads shall conform with grating requirements, unless noted otherwise. Use
<br />checkerpiate nosing.
<br />SUBMITTALS
<br />1. General Contractor shall check and stamp all shop drawings before submitting to
<br />Engineer. Unchecked submittals and /or submittals that substantially deviate from the
<br />Contract Documents will be returned without review.
<br />2. As a minimum, shop drawings shall include comprehensive layouts, member sizes.
<br />fabrication requirements and connections as required to demonstrate a complete
<br />understanding of the structural system to be constructed. Refer to individual material
<br />general notes for additional requirements.
<br />3. Product catalog pages and reproductions of Contract Documents do not demonstrate
<br />the required understanding of the structural Intent, and will be retumed without review.
<br />4. General Contractor shall submit shop drawings and proprietary documentation in a
<br />timely manner to permit minimum ten working days for review by Engineer. Contractor
<br />Shall coordinate construction schedule to account for correction of errors and
<br />reaubmlttale, If required.
<br />5. Engineer's review of shop drawings does not relieve Contractor of responsibility to
<br />follow all requirements of the Contract Documents.
<br />6. General Contractor shall submit In writing any requests to modify the Contract
<br />Documents. Such requests shall not be considered accepted until they have been
<br />specifically addressed by the Engineer. Shop drawings alone do not constitute 'In
<br />writing'. unless specific proposed changes are clearly identified. Proposed changes
<br />shall be coordinated by the individual initiating the change.
<br />INSPECTOR AND SPECIAL INSPECTION
<br />1. All Inspection shall conform to the requirements of Section 109 of the International
<br />Building Code. All Special Inspection shall conform to the requirement. of Section
<br />1704 of the intemational Building Code.
<br />2. The owner Is required to employ Inspectors and special Inspectors. who shall submit
<br />copies of all reports to the owner, architect, structural engineer. and the Building
<br />Department. Upon completion of their scrape of work, the inspectors and special
<br />inspectors shall submit a final signed report stating whether the work was, to the best
<br />of their knowledge. In conformance with the approved set of Contract Documents and
<br />the applicable workmanship provisions of the Building Code.
<br />3. Inspectors and special Inspectors shall be qualified person(s) who demonstrate
<br />competence In their respective two of construction to the satisfaction of the
<br />Building Official.
<br />4. The General Contractor shall coordinate with Inspectors and special Inspectors to
<br />Incorporate the inspection schedule into the overall project construction schedule.
<br />5. Special Inspection la required for, but not limited to, the following types of work.
<br />Refer to the project specifications and the IBC for additional Information regarding
<br />testing and inspection requirements.
<br />Soil preparation Table 1704.7
<br />Drilled piers / mlaopiles. Table 1704.9
<br />Structural concrete Section 109.3.1, Section 109.3.2, Table 1704.4
<br />Structural masonry Table 1704.5.1
<br />Structural steel fabricator Section 1704.2
<br />Structural steel construction Section 109.3.4, Table 1704.3
<br />6. The Engineer of Record shall not be considered a Special inspector.
<br />7. The Engineer of Record shall be provided Jobelte access to conduct quality assurance.
<br />This drawing together with any and all additions, correc-
<br />tions, changes and alterations thereof is the property of
<br />Climax Molybdenum Co. and is furnished on the express
<br />condition that it shall not be reproduced, copied, lent, or
<br />disposed of directly or indirectly, nor used for any other
<br />purpose than for which it is specifically furnished without
<br />prior written consent of said Climax Molybdenum Co.
<br />REFERENCE DRAWINGS
<br />DESCRIPTION OF REVISION
<br />f
<br />2
<br />3
<br />4
<br />5
<br />DATE
<br />BY
<br />SCALE
<br />PLOT SCALE
<br />INVERT OF SCALE
<br />COMPUTER FILE:
<br />.DWG
<br />PAPER SIZE D
<br />ENGINEER:
<br />DRAWN BY:
<br />CHECKED BY:
<br />APPROVED BY:
<br />APPROVED BY:
<br />DATE
<br />CLIMAX MOLYBDENUM COMPANY
<br />19302 COUNTY ROAD No. 3
<br />PARSHALL, CO
<br />(303) 569 -3221
<br />SHEET No.
<br />NO.
<br />6931
<br />ERE
<br />MIMI 1
<br />MEI 2
<br />ELI
<br />132 4
<br />126085
<br />2236
<br />221114
<br />2502 a
<br />RE ON= - 188U68
<br />DATE
<br />26 -18-10
<br />06-2-10
<br />06 -9)-10
<br />all -01-10
<br />08 -16-10
<br />11-09 -10
<br />u -29-I0
<br />12 -17 -10
<br />12-12 -11
<br />05-08-1
<br />DESCRIPTION
<br />Par
<br />ND
<br />1119 I
<br />MOM 2
<br />1
<br />921911 ION MRS
<br />EMU, Bin=
<br />699
<br />a 4
<br />WED 911t0iCi
<br />BAUR & ASSOCIATES
<br />CONSULTING ENGINEERS
<br />2551 31st Soto Boulder, CO 80301
<br />103- 444 -9121 (4 303 - 415 -1070 i1)
<br />a.jcbaur.com
<br />ISVISIOnt sesa Ma at
<br />on a tea toe geo p r r� and
<br />m Oaks eaa N snot a b b err
<br />contras= bo a mans curs nr at
<br />PROJECT:
<br />LLE BLAKER
<br />f .134D078ON p L
<br />117302 COUNTY RD.
<br />NO. 3
<br />PAR81ALL CO
<br />DATE:
<br />08±88:
<br />CRECEED:
<br />00 -Is-10
<br />NE8
<br />RW
<br />// OREE TIME
<br />M�y � ��
<br />Ci.1QAL
<br />NO1E8
<br />PROWL' 110.
<br />NOTED
<br />IODEE
<br />I DRAWING N0.
<br />T1.1
<br />HENDERSON MILL SITE
<br />LIME SLAKER PROJECT
<br />DWG No.
<br />REV. Let.
<br />
|